Contractor · Specialty (solar, fire, telecom)

GAF ENERGY LLC

123 building permits since 2024 in Marion County, OR; Eugene city, OR and Douglas County, OR, across 9 counties — $1,029,687 in reported job value over 86 permits that state one.

Building permits
123
Reported job value
$1M
Active
2024–2026
Latest permit
Oct 27, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Marion County, OR18
  • Eugene city, OR15
  • Douglas County, OR13
  • Tillamook County, OR9
  • Salem city, OR9
  • Roseburg city, OR8
  • Woodburn city, OR8
  • Lane County, OR7
  • Hillsboro city, OR5
  • Keizer city, OR4

Permits by year

By issue date (application date where there is none).

03060
58
202420252026*
* 2026 is year to date.
View as table
YearPermits
202439
202558
2026 (YTD)26

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar113
  • Roofing91
  • Electrical74
  • Remodels1
  • New construction1

Permit types

As the building departments classify them.

  • Electrical31
  • Residential Electrical29
  • Residential Structural27
  • Building13
  • Alternate Energy5
  • Residential Revision5
  • Residential Solar3
  • SOLAR - RESIDENTIAL 1 AND 23

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 27, 2026Residential ElectricalInstallation of a non-prescriptive 3.99 kW BIPV solar shingle system. Breaker tie-in. No MPU or Ess.Lane County—
Oct 27, 2026Residential SolarDPR: roof-mounted solar shingle system non-prescriptive 3.99 kW BIPV. Breaker tie-in.Lane County$12,768
Sep 29, 2026ElectricalAdded AC disconnect to existing solar project.Douglas County—
Sep 17, 2026Residential StructuralMorales - BIPV Structural Installation of a non-prescriptive 2.964 kW BIPV solar shingle system. Shingles will be nailed to the roof. No rail/rack included.Woodburn City$9,485
Sep 11, 2026Residential ElectricalRE ONLY FOR Installation of a non-prescriptive 2.964 kW BIPV solar shingle system. (1) Delta M4-TL-US inverter. Breaker tie-in.Woodburn City$9,485
Sep 11, 2026Residential ElectricalMorales - BIPV Electrical RE ONLY FOR Installation of a non-prescriptive 2.964 kW BIPV solar shingle system. (1) Delta M4-TL-US inverter. Breaker tie-in.Marion County$9,485
Jun 3, 2026BuildingInstallation of a 1.995 kW BIPV solar shingle system. Non-Roseburg city$11,371
May 21, 2026Residential Electricalinstallation of a 5.060 BIPV solar shingle system, non-prescriptive, breaker tie-in, see BP26-01374Lane County—

Permit status

Where its permits stand, as the departments report them.

  • Finaled72
  • Issued24
  • Active8
  • Closed7
  • Additional information required6
  • Expired2
  • Pending1
  • Approved1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.