Contractor · Specialty (solar, fire, telecom)
GAF ENERGY LLC
193 building permits since 2022 in Howard County, MD; Chesterfield County, VA and Henrico County, VA, across 15 counties — $2,202,286 in reported job value over 145 permits that state one.
- Building permits
- 193
- Reported job value
- $2.2M
- Active
- 2022–2026
- Latest permit
- Aug 20, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Howard County, MD56
- Chesterfield County, VA50
- Henrico County, VA25
- Cary town, NC13
- Arlington County, VA11
- Anne Arundel County, MD10
- Greensboro city, NC6
- Chesapeake city, VA5
- Buncombe County, NC4
- Rockville city, MD3
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 23 |
| 2023 | 71 |
| 2024 | 51 |
| 2025 | 39 |
| 2026 (YTD) | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar162
- Roofing134
- Electrical82
- Remodels53
- Additions28
- Battery storage2
Permit types
As the building departments classify them.
- Residential Electrical Addition Alteration Permit28
- Solar Express (Residential Only)28
- Electrical25
- Residential Building25
- Residential Electrical25
- Alteration23
- Residential Solar Permit10
- New Installation4
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 20, 2026 | Residential Electrical Addition Alteration Permit | Solar Shingles: Residential Roof-Integrated Pv/ System Size: 4.845kw/Pv Shingles (85) Gaf Energy Tls-2/ Inverter: (1) Delta M6-Tl-Us + (1) Delta M4-Tl-Us PANELS | Howard County | — |
| Aug 19, 2026 | Solar Express (Residential Only) | Solar Shingles: Residential Roof-Integrated PV/ System Size: 4.845kw/PV Shingles (85) GAF Energy TLS-2/ Inverter: (1) Delta M4-TL-US + (1) Delta M4-TL-US 85 PAN | Howard County | $11,628 |
| Jul 2, 2026 | Residential Electrical Addition Alteration Permit | Solar Shingles: Residential Roof-Integrated Pv/ System Size: 8.037kw/Pv Shingles (141) Gaf Energy Tls-2/ Inverter: (1) Delta M6-Tl-Us + (1) Delta M8-Tl-Us PANEL | Howard County | — |
| Jul 2, 2026 | Solar Express (Residential Only) | Solar Shingles: Residential Roof-Integrated PV/ System Size: 8.037kw/PV Shingles (141) GAF Energy TLS-2/ Inverter: (1) Delta M8-TL-US EXISTING USE: SFD 141 PANE | Howard County | $19,288 |
| Jun 5, 2026 | Electrical | Solar PV System | Town Of Cary | $29,366 |
| Dec 23, 2025 | Electrical | Solar Shingles: Residential Roof-Integrated PV Installation/ System Size: 3.591KW/PV Shingle (63) GAF Energy Timberline Solar ES/ Inverter: (1) Delta M4-TL-US | Arlington County | — |
| Dec 22, 2025 | Residential Electrical Addition Alteration Permit | Solar Shingles: Residential Roof-Integrated Pv/ System Size: 7.809kw/Pv Shingles (137) Gaf Energy Tls-2/ Inverter: (1) Delta M6-Tl-Us + (1) Delta M4-Tl-Us + (N) | Howard County | — |
| Dec 22, 2025 | Residential Electrical Addition Alteration Permit | Solar Shingles: Residential Roof-Integrated pv/ System Size: 9.747kw/pv Shingles (171) gaf Energy tls-2/ Inverter: (1) Delta m6-tl-us + (1) Delta m6-tl-us + (n) | Howard County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed74
- Issued59
- Closed17
- Finaled17
- C/o issued14
- Cancelled4
- Active3
- Expired3
Also on file as
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.