Contractor · Specialty (solar, fire, telecom)

GAF ENERGY LLC

19 building permits since 2022 in Boulder city, CO; Thornton city, CO and Broomfield County, CO, across 3 counties — $296,835 in reported job value over 13 permits that state one.

Building permits
19
Reported job value
$296.8K
Active
2022–2025
Latest permit
Sep 16, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boulder city, CO8
  • Thornton city, CO4
  • Broomfield County, CO3
  • Adams County, CO2
  • Boulder County, CO2

Permits by year

By issue date (application date where there is none).

048
7
2022202320242025
View as table
YearPermits
20227
20235
20243
20254

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar18
  • Roofing16
  • Electrical14

Permit types

As the building departments classify them.

  • Electrical Permit8
  • B-Add/Alt Solar Panel/Res3
  • Electrical PV Solar3
  • Residential Roof Mounted Solar Electrical System2
  • Electrical1
  • Residential Solar1
  • Residential Solar - Expedited1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 16, 2025Residential Roof Mounted Solar Electrical SystemSolar PV System - Additional 3.42 kW Flush Mount, Grid Tied Solar Shingles On House & BarnBoulder County$18,654
Aug 27, 2025Residential Roof Mounted Solar Electrical SystemSolar PV System - Additional 9.006 kW Solar Shingles, Flush Mount, Grid TiedBoulder County$24,316
Aug 1, 2025Electrical PV SolarInstallation of a 8.265 kW BIPV solar shingle system. Breaker tie-in. No structural or electrical upgrades included. Shingles will be nailed to the roof.*ContraThornton City—
Jul 2, 2025B-Add/Alt Solar Panel/ResSolar PV Roof Shingle SystemBroomfield County—
Dec 2, 2024Electrical PV SolarInstallation of a 5.152 kW BIPV solar shingle system. Shingles are nailed to roof like standard asphalt shingles. No rail/racking included.Thornton City—
Aug 16, 2024Electrical PV SolarInstallation of a 5.52 kW BIPV solar shingle system. No structural upgrades are needed. Shingle will be nailed to roof.Thornton City—
Feb 5, 2024Electrical PermitInstallation of a 3.036 kW BIPV solar shingle system. Associated with RFG2024-00045.Boulder$24,288
Sep 21, 2023B-Add/Alt Solar Panel/ResSolar PV SystemBroomfield County—

Permit status

Where its permits stand, as the departments report them.

  • Completed8
  • Closed4
  • Not stated3
  • Issued2
  • Void1
  • Withdrawn1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.