Contractor · Specialty (solar, fire, telecom)
Tesla Energy Operations Inc
18 building permits since 2018 in Minneapolis city, MN and Lino Lakes city, MN, across 2 counties — $160,221 in reported job value over 17 permits that state one.
- Building permits
- 18
- Reported job value
- $160.2K
- Active
- 2018–2021
- Latest permit
- Sep 9, 2021
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Minneapolis city, MN17
- Lino Lakes city, MN1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 6 |
| 2019 | 6 |
| 2021 | 6 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar15
- Roofing12
- Electrical10
- Battery storage2
Permit types
As the building departments classify them.
- Res17
- Building1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 9, 2021 | Res | INSTALL 35 ROOF-MOUNTED SOLAR PV (ELECTRICAL GENERATION) PANELS ALONG WITH ENERGY STORAGE SYSTEM ON ROOF OF EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLANS | Minneapolis City | $11,900 |
| Sep 9, 2021 | Res | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY __8.16__ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Subp.5 | Minneapolis City | $8,160 |
| Sep 9, 2021 | Res | (DMH-ProjectDox) INSTALL FLUSH MOUNTED PV SOLAR PANEL SYSTEM ON ROOF OF SFD. COLLECTOR CAPACITY 7.48 KW. SOLAR CHECKLIST COMPLETED. 2020 IRC A 36" wide pathway | Minneapolis City | $7,480 |
| Jul 12, 2021 | Res | install energy storage system. sck separate electrical permit required. | Minneapolis City | $1,000 |
| Jun 30, 2021 | Building | Solar Panels | Lino Lakes | — |
| Jun 21, 2021 | Res | INSTALL SOLAR SYSTEM ON ROOF ______ COLLECTOR CAPACITY 5.1kWDC ______ SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Subp.5a as app | Minneapolis City | $5,100 |
| Nov 5, 2019 | Res | INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. _____ COLLECTOR CAPACITY 3.78 KW _____ SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.110 | Minneapolis City | $5,670 |
| Oct 15, 2019 | Res | — | Minneapolis City | $17,010 |
Permit status
Where its permits stand, as the departments report them.
- Closed15
- Cancelled2
- Finaled1
Also on file as
The same name elsewhere
- TESLA ENERGY OPERATIONS INCLos Angeles city, CA13.3K
- TESLA ENERGY OPERATIONS INCHoward County, MD3.6K
- Tesla Energy Operations IncThornton city, CO2.1K
- TESLA ENERGY OPERATIONS, INC.Las Vegas city, NV963
- TESLA ENERGY OPERATIONS, INC.Collier County, FL793
- TESLA ENERGY OPERATIONS, INC.Cary town, NC251
- TESLA ENERGY OPERATIONS INCMarion County, OR214
- TESLA ENERGY OPERATIONS INCMesa city, AZ139
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.