Contractor · Electrical
TESLA ENERGY OPERATIONS INC
139 building permits since 2018 in Mesa city, AZ — $2,038,173 in reported job value over 139 permits that state one.
- Building permits
- 139
- Reported job value
- $2M
- Active
- 2018–2026
- Latest permit
- Aug 18, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ139
Permits by year
By issue date (application date where there is none).
03060
56
20182020202220242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 9 |
| 2019 | 8 |
| 2020 | 2 |
| 2021 | 56 |
| 2022 | 25 |
| 2023 | 13 |
| 2024 | 9 |
| 2025 | 12 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical138
- Solar93
- Battery storage91
- EV chargers20
- Electric meters19
Permit types
As the building departments classify them.
- Electrical138
- Other Commercial1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 18, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES AND ONE TESLA POWERWALL3 EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTUR | Mesa | $37,405 |
| Apr 24, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVIC | Mesa | $34,639 |
| Feb 20, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTIL | Mesa | $14,000 |
| Jan 29, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED | Mesa | $87,926 |
| Oct 16, 2025 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A TESLA WALL CONNECTOR VEHICLE CHARGE | Mesa | $31,780 |
| Oct 12, 2025 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL3 BATTERES AND INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR TWO TESLA UNIVERSAL WALL CONNECTOR V | Mesa | $42,380 |
| Oct 1, 2025 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UT | Mesa | $42,181 |
| Sep 23, 2025 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF FOUR TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE U | Mesa | $59,513 |
Permit status
Where its permits stand, as the departments report them.
- C/o issued130
- Issued8
- Pending payment1
Also on file as
The same name elsewhere
- TESLA ENERGY OPERATIONS INCLos Angeles city, CA13.3K
- TESLA ENERGY OPERATIONS INCHoward County, MD3.6K
- Tesla Energy Operations IncThornton city, CO2.1K
- TESLA ENERGY OPERATIONS, INC.Las Vegas city, NV963
- TESLA ENERGY OPERATIONS, INC.Collier County, FL793
- TESLA ENERGY OPERATIONS, INC.Cary town, NC251
- TESLA ENERGY OPERATIONS INCMarion County, OR214
- TESLA ENERGY OPERATIONS, INC.Sugar Land city, TX120
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.