Contractor · Electrical

TESLA ENERGY OPERATIONS INC

139 building permits since 2018 in Mesa city, AZ — $2,038,173 in reported job value over 139 permits that state one.

Building permits
139
Reported job value
$2M
Active
2018–2026
Latest permit
Aug 18, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Mesa city, AZ139

Permits by year

By issue date (application date where there is none).

03060
56
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20189
20198
20202
202156
202225
202313
20249
202512
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical138
  • Solar93
  • Battery storage91
  • EV chargers20
  • Electric meters19

Permit types

As the building departments classify them.

  • Electrical138
  • Other Commercial1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 18, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES AND ONE TESLA POWERWALL3 EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURMesa$37,405
Apr 24, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICMesa$34,639
Feb 20, 2026ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILMesa$14,000
Jan 29, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMEDMesa$87,926
Oct 16, 2025ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A TESLA WALL CONNECTOR VEHICLE CHARGEMesa$31,780
Oct 12, 2025ElectricalPERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL3 BATTERES AND INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR TWO TESLA UNIVERSAL WALL CONNECTOR VMesa$42,380
Oct 1, 2025ElectricalPERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTMesa$42,181
Sep 23, 2025ElectricalPERMIT IS ONLY FOR INSTALLATION OF FOUR TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UMesa$59,513

Permit status

Where its permits stand, as the departments report them.

  • C/o issued130
  • Issued8
  • Pending payment1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.