Contractor · Electrical
FREEDOM SOLAR LLC
20 building permits since 2022 in Chesterfield County, VA — $3,215,666 in reported job value over 20 permits that state one.
- Building permits
- 20
- Reported job value
- $3.2M
- Active
- 2022–2024
- Latest permit
- May 10, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Chesterfield County, VA20
Permits by year
By issue date (application date where there is none).
0510
10
202220232024
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 10 |
| 2023 | 6 |
| 2024 | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar20
- Electrical13
- Battery storage7
- Roofing2
- EV chargers1
Permit types
As the building departments classify them.
- Residential Electrical8
- Residential Building6
- Commercial Building3
- Commercial Electrical3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 10, 2024 | Commercial Building | EXT RENO - Installation of a 279.36kW commercial solar photovoltaic electric generation system will be on the building's roof to enable grid-interactive operati | Chesterfield County | $670,464 |
| May 10, 2024 | Commercial Electrical | ELEC - Installation of a 279.36kW commercial solar photovoltaic electric generation system will be on the building's roof to enable grid-interactive operation ( | Chesterfield County | $670,464 |
| Mar 20, 2024 | Commercial Building | EXT RENO - Install a 120.28kW DC roof-mounted PV solar system. This is a grid interactive system without energy storage. CMA Colonial Hyundai | Chesterfield County | $287,508 |
| Mar 20, 2024 | Commercial Electrical | ELEC - Wire for the installation of a roof-mounted PV Solar System on an existing commercial building. The System size is 120.28kW DC.This is grid Interactive s | Chesterfield County | $287,508 |
| Dec 14, 2023 | Residential Electrical | Installation of two Tesla Powerwall batteries and one Tesla Energy Gateway to an already existing, roof-mounted PV solar system. *SHUTDOWN REQUIRED FOR INSTALL* | Chesterfield County | $31,000 |
| Dec 6, 2023 | Commercial Electrical | ELEC - Photovoltaic installation of a 173.63 kW solar system consisting of 358 high-efficiency 485 W solar panels. This system will be seamlessly interconnected | Chesterfield County | $416,712 |
| Nov 16, 2023 | Commercial Building | EXT RENO - Photovoltaic installation of a 173.63 kW solar system consisting of 358 high-efficiency 485 W solar panels. This system will be seamlessly interconne | Chesterfield County | $416,712 |
| Oct 19, 2023 | Residential Electrical | Installing EV charger to existing PV, roof-mounted solar system | Chesterfield County | $1,414 |
Also on file as
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.