Contractor · Specialty (solar, fire, telecom)

FREEDOM SOLAR LLC

34 building permits since 2022 in Greensboro city, NC; Gaston County, NC and Johnston County, NC, across 7 counties — $936,652 in reported job value over 21 permits that state one.

Building permits
34
Reported job value
$936.7K
Active
2022–2024
Latest permit
Nov 20, 2024

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Greensboro city, NC12
  • Gaston County, NC5
  • Johnston County, NC5
  • Currituck County, NC3
  • Stump Sound township, NC2
  • Brassfield township, NC1
  • Dutchville township, NC1
  • Tally Ho township, NC1
  • Walnut Grove township, NC1
  • Cary town, NC1

Permits by year

By issue date (application date where there is none).

07.515
14
202220232024
View as table
YearPermits
20222
202311
202414

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar27
  • Electrical9
  • Battery storage6

Permit types

As the building departments classify them.

  • Electrical8
  • BD-Solar Panels Roof-Mount5
  • Residential5
  • Residential - Solar Panels5
  • SOLAR PANELS5
  • CSS RESIDENTIAL APPLICATION3
  • BD-Other1
  • Residential Accessory - Solar Panels - Roof Mounted1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Nov 20, 2024ElectricalSOLAR PV SYSTEMTown Of Cary$15,906
Aug 14, 2024BD-Solar Panels Roof-MountPV ROOFTOP 7.900 KW SOLAR SYSTEM W/ 20 PANELS, 1 TESLA POWER WALL AND 1 TESLA EG "SHUTDOWN NEEDED TO INSTALL TESLA EG"Dutchville township—
Aug 8, 2024SOLAR PANELSSOLAR PANELSJohnston County$21,628
Aug 6, 2024Residential Accessory - Solar Panels - Roof MountedInstallation of PV, roof mounted solar system 32 panels, 1 tesla powerwall & 1 tesla energy gatewayStump Sound township$91,197
Jul 22, 2024Residential Electrical - Residential Electrical.2Installation of PV, roof mounted solar system 32 panels, 1 tesla powerwall & 1 tesla energy gatewayStump Sound township$91,197
Jun 18, 2024ResidentialInstall PV, roof-mounted 7.110 kW solar system with 18 panels, 1 Tesla Powerwall & 1 Tesla Energy...Greensboro City$37,768
Jun 13, 2024SOLAR PANELSSOLAR PANELSJohnston County$45,511
Jun 11, 2024CSS RESIDENTIAL APPLICATIONSOLAR: Installation of a PV, roof-mounted 9.350 kW solarCurrituck County$33,888

Permit status

Where its permits stand, as the departments report them.

  • Finaled10
  • Completed9
  • C/o issued6
  • Expired5
  • Active3
  • Approved1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.