Contractor · Specialty (solar, fire, telecom)
SOLAR NEGOTIATORS
55 building permits since 2021 in Merced city, CA; Kern County, CA and Monterey County, CA, across 8 counties — $1,606,749 in reported job value over 45 permits that state one.
- Building permits
- 55
- Reported job value
- $1.6M
- Active
- 2021–2026
- Latest permit
- Apr 24, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Merced city, CA43
- Kern County, CA6
- Monterey County, CA1
- Tuolumne County, CA1
- Concord city, CA1
- Fontana city, CA1
- Los Angeles city, CA1
- Riverside city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 2 |
| 2022 | 17 |
| 2023 | 9 |
| 2024 | 14 |
| 2025 | 2 |
| 2026 (YTD) | 10 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar45
- Roofing42
- HVAC40
- Plumbing40
- Battery storage17
- Electrical15
- Electric meters2
- Additions1
Permit types
As the building departments classify them.
- PHOTOVOLTAIC SYSTEMS40
- Electrical10
- ELEC., PLUMB., MECH3
- Residential1
- Residential Roof Mount Solar (15 kw or less)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Apr 24, 2026 | Residential Roof Mount Solar (15 kw or less) | — | Tuolumne County | $34,686 |
| Mar 24, 2026 | Electrical | Rooftop mounted solar energy system pv+st 23 q.peak duo blk ml-g10.c+ 410 solar modules 23 iq8hc-72-m-dom-us {240v} microinverters 2 iqbattery-10c-1p-na ess new | Kern County | — |
| Mar 9, 2026 | Electrical | Install roof mount solar with (2) batteries at ex sfr | Kern County | — |
| Mar 5, 2026 | Electrical | Installation of roof-mounted 12.47 kw dc, (n) 29 q.cell modules, (n) 1 tesla battery with integrated inverter, (n) 1 tesla battery expansion unit, (n) tesla 11 | Fontana City | — |
| Jan 30, 2026 | Electrical | Installation of roof mounted 5.74 kw dc, (n) 14 q.cell modules, (n) 14 enphase micro-inverters, (n) junction box, (n) enphase 200a iq combiner box, (n) enphase | Kern County | — |
| Jan 22, 2026 | Electrical | Change in module type and increase in panel count from 11 to 12 and increase in kw from 4.73 to 4.98; change in equipment type and inverters; addition of 200a b | Monterey County | — |
| Jan 9, 2026 | Electrical | Installation of roof-mounted 4.10 kw dc, (n) 10 q.cell modules, (n) 10 enphase micro-inverters, (n) junction box, (n) enphase iq combiner box, asphalt shingle r | Kern County | — |
| Jan 8, 2026 | Electrical | Installation of roof-mounted 7.70 kw dc, (n) 19 q.cell modules, (n) 19 enphase micro-inverters, (n) junction box, (n) enphase iq combiner box, (n) 1 tesla batte | Kern County | — |
Permit status
Where its permits stand, as the departments report them.
- Issued43
- Active7
- Finaled2
- Not stated2
- Additional information required1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.