Contractor · Specialty (solar, fire, telecom)

SOLAR NEGOTIATORS

55 building permits since 2021 in Merced city, CA; Kern County, CA and Monterey County, CA, across 8 counties — $1,606,749 in reported job value over 45 permits that state one.

Building permits
55
Reported job value
$1.6M
Active
2021–2026
Latest permit
Apr 24, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Merced city, CA43
  • Kern County, CA6
  • Monterey County, CA1
  • Tuolumne County, CA1
  • Concord city, CA1
  • Fontana city, CA1
  • Los Angeles city, CA1
  • Riverside city, CA1

Permits by year

By issue date (application date where there is none).

01020
17
202120222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20212
202217
20239
202414
20252
2026 (YTD)10

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar45
  • Roofing42
  • HVAC40
  • Plumbing40
  • Battery storage17
  • Electrical15
  • Electric meters2
  • Additions1

Permit types

As the building departments classify them.

  • PHOTOVOLTAIC SYSTEMS40
  • Electrical10
  • ELEC., PLUMB., MECH3
  • Residential1
  • Residential Roof Mount Solar (15 kw or less)1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 24, 2026Residential Roof Mount Solar (15 kw or less)—Tuolumne County$34,686
Mar 24, 2026ElectricalRooftop mounted solar energy system pv+st 23 q.peak duo blk ml-g10.c+ 410 solar modules 23 iq8hc-72-m-dom-us {240v} microinverters 2 iqbattery-10c-1p-na ess newKern County—
Mar 9, 2026ElectricalInstall roof mount solar with (2) batteries at ex sfrKern County—
Mar 5, 2026ElectricalInstallation of roof-mounted 12.47 kw dc, (n) 29 q.cell modules, (n) 1 tesla battery with integrated inverter, (n) 1 tesla battery expansion unit, (n) tesla 11 Fontana City—
Jan 30, 2026ElectricalInstallation of roof mounted 5.74 kw dc, (n) 14 q.cell modules, (n) 14 enphase micro-inverters, (n) junction box, (n) enphase 200a iq combiner box, (n) enphase Kern County—
Jan 22, 2026ElectricalChange in module type and increase in panel count from 11 to 12 and increase in kw from 4.73 to 4.98; change in equipment type and inverters; addition of 200a bMonterey County—
Jan 9, 2026ElectricalInstallation of roof-mounted 4.10 kw dc, (n) 10 q.cell modules, (n) 10 enphase micro-inverters, (n) junction box, (n) enphase iq combiner box, asphalt shingle rKern County—
Jan 8, 2026ElectricalInstallation of roof-mounted 7.70 kw dc, (n) 19 q.cell modules, (n) 19 enphase micro-inverters, (n) junction box, (n) enphase iq combiner box, (n) 1 tesla batteKern County—

Permit status

Where its permits stand, as the departments report them.

  • Issued43
  • Active7
  • Finaled2
  • Not stated2
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.