Contractor · Electrical

UNIVERSAL SIGN INSTALLATION LLC

56 building permits since 2022 in Mesa city, AZ and Phoenix city, AZ — $51,500 in reported job value over 15 permits that state one.

Building permits
56
Reported job value
$51.5K
Active
2022–2026
Latest permit
Oct 23, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Mesa city, AZ41
  • Phoenix city, AZ15

Permits by year

By issue date (application date where there is none).

012.525
25
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20223
202325
20247
202510
2026 (YTD)9

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical5
  • HVAC1
  • Solar1
  • Plumbing1
  • Windows & doors1
  • New construction1

Permit types

As the building departments classify them.

  • SE15
  • 12 West Brewing Co - A FRAMES1
  • AT&T Dobson1
  • AT & T Power Rd1
  • AT&T Stapley1
  • AT&T Val Vista1
  • Best Westen Plus1
  • Brakemasters 1511

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 23, 2026IGNITE ADVENTURE PARK - ATTACHED SIGNsInstall (2) sets of illuminated pan channel letters and (1) illuminated wall logo. 123 sq ft IGNITE, 37 sq ft ADVENTURE PARK and 74 sqft LOGO. Replace 2 monumenMesa—
Oct 12, 2026FIVE GUYSInstall three 50 sq. ft. each LED illuminated pan channel letter sets on backer panel on north, east and west elevations of suite FIVE GUYS and install tenant pMesa—
Oct 5, 2026Fairfield by Marriott - LED SignsInstall 4 LED illuminated pan channel lettersets FAIRFIELD BY MARRIOTT east elevation 128 sq. ft. and west, north and south elevations at 72 sq. ft. each and 1 Mesa—
Aug 24, 2026Livaway Suites - Illuminated SignsInstall four LED illuminated pan channel lettersets and logo on a new building. LIVAWAY SUITES east and west elevations 36 sq. ft. each, north and south 23 sq. Mesa—
Aug 5, 2026SERVICE EXPERTS 468Remove existing non illuminated DUKE OF AIR FCO letters from building and existing monument sign. Install one new non illuminated FCOs lettersets and logo to weMesa—
May 14, 2026Brakemasters 151Remove current LIFETIME BRAKES wall sign and install new LED illuminated pan channel letter sets to west elevation COMPLETE CAR CARE 89 sq. ft. Total existing sMesa—
Apr 15, 2026Valvoline Instant Oil ChangeInstall two illuminated wall signs on front and rear elevations. VALVOLINE INSTANT OIL CHANGE 45.36 Sq ft. Install two illuminated wall signs on left and right Mesa—
Mar 31, 2026Contact Physical TherepyInstall one LED illuminated set of pan channel letters and tagline on a backer panel on front elevation of suite. CONTACT PHYSICAL THERAPY 32 sq. ft. Signs shalMesa—

Permit status

Where its permits stand, as the departments report them.

  • Finaled31
  • Completed14
  • Issued8
  • Additional information required2
  • Active1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.