Contractor · Electrical
ADVANCED ENERGY SYSTEM
566 building permits since 2004 in Eugene city, OR; Marion County, OR and Benton County, OR, across 10 counties — $7,910,089 in reported job value over 262 permits that state one.
- Building permits
- 566
- Reported job value
- $7.9M
- Active
- 2004–2026
- Latest permit
- Oct 8, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Eugene city, OR348
- Marion County, OR62
- Benton County, OR26
- Salem city, OR26
- Douglas County, OR21
- Medford city, OR17
- Lane County, OR15
- Woodburn city, OR7
- Springfield city, OR6
- Newport city, OR5
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2004 | 1 |
| 2007 | 10 |
| 2008 | 13 |
| 2009 | 8 |
| 2010 | 11 |
| 2011 | 24 |
| 2012 | 37 |
| 2013 | 22 |
| 2014 | 25 |
| 2015 | 25 |
| 2016 | 47 |
| 2017 | 35 |
| 2018 | 21 |
| 2019 | 44 |
| 2020 | 34 |
| 2021 | 54 |
| 2022 | 33 |
| 2023 | 42 |
| 2024 | 29 |
| 2025 | 40 |
| 2026 (YTD) | 11 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar499
- Electrical463
- Roofing115
- Additions84
- Battery storage24
- Plumbing18
- New construction8
- EV chargers7
- Water heaters7
- Remodels6
Permit types
As the building departments classify them.
- Electrical339
- Commercial Electrical47
- Commercial Structural43
- Residential Electrical37
- Building25
- Residential Structural24
- Plumbing14
- RESIDENTIAL11
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 8, 2026 | Electrical | 7.65KWDC Roof Mounted PV Array | Eugene | — |
| Aug 27, 2026 | Electrical | Install a 6.53 KWDC Roof mounted PV system with Battery Backup | Eugene | — |
| Jul 16, 2026 | Electrical | Install of a NEW 6.09KWDC roof mounted array on an existing dwelling. | Eugene | — |
| Jun 30, 2026 | Residential Electrical | Adding an additional 33.14KWH battery bank to an existing Battery storage System | Coos County | $18,500 |
| May 7, 2026 | Residential Solar | DPR: roof-mounted solar PV installation on existing dwelling. | Lane County | $23,060 |
| Apr 23, 2026 | Residential Solar | DPR: new roof-mounted 7.83 KW solar PV array on dwelling. | Lane County | $15,006 |
| Apr 20, 2026 | Residential Solar | DPR - INSTALLTION OF A 11.75 KW ROOF MOUNTED SOLAR PV ARRAY ON An SFD, WITH BATTERY BACKUP | Lane County | — |
| Apr 17, 2026 | Residential Electrical | 9.24 KWDC Solar PV Ground mount <10' in height. With electrical Tie into a Single-family dwelling. Include a 9.04 kWh Battery storage system | Benton County | $26,362 |
Permit status
Where its permits stand, as the departments report them.
- Issued380
- Finaled128
- Closed22
- Active17
- Withdrawn6
- Documents submitted4
- Void3
- Expired2
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- ADVANCED ENERGY SYSTEMS LLC
- ADVANCED ENERGY SYSTEMS
- ADVANCED ENERGY SYTEMS
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.