Contractor · Specialty (solar, fire, telecom)
MAYER SOLAR, LLC
56 building permits since 2024 in Sugar Land city, TX; Lewisville city, TX and Tyler city, TX, across 10 counties — $351,785 in reported job value over 35 permits that state one.
- Building permits
- 56
- Reported job value
- $351.8K
- Active
- 2024–2026
- Latest permit
- Oct 15, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sugar Land city, TX15
- Lewisville city, TX11
- Tyler city, TX7
- Friendswood city, TX6
- Laredo city, TX6
- Amarillo city, TX2
- Denton city, TX2
- Ingleside city, TX2
- Nacogdoches city, TX2
- New Braunfels city, TX2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 5 |
| 2025 | 15 |
| 2026 (YTD) | 36 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar50
- Electrical23
- Roofing6
- Battery storage5
Permit types
As the building departments classify them.
- RESIDENTIAL ELECTRICAL SERVICE11
- SOLAR PANEL - RESIDENTIAL11
- SOLAR PANEL4
- ELECTRICAL3
- Electrical - Solar Panel3
- Other Permits - Solar Panel3
- SOLAR PANEL PERMIT3
- ELECTRICAL - SOLAR2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 15, 2026 | SOLAR PANEL - RESIDENTIAL | — | Lewisville | $10,660 |
| Oct 9, 2026 | SOLAR PANEL - RESIDENTIAL | — | Lewisville | $10,000 |
| Sep 30, 2026 | Electrical Standalone | SOLAR PANEL INSTALL | Nacogdoches | $8,000 |
| Sep 22, 2026 | RESIDENTIAL ELECTRICAL SERVICE | THIS PROJECT INVOLVES INSTALLING A $6.15\TEXT{ KW DC} / 4.48\TEXT{ KW AC}$ ROOF-MOUNTED SOLAR ARRAY CONSISTING OF 15 PANELS AND 8 MICROINVERTERS. IT INTEGRATES | Sugar Land | $6,000 |
| Sep 17, 2026 | RESIDENTIAL ELECTRICAL SERVICE | THIS PROJECT INVOLVES INSTALLING A 9.43 KW DC / 6.95 KW AC ROOF-MOUNTED SOLAR PHOTOVOLTAIC SYSTEM WITH 23 SOLAR MODULES AND 13 MICROINVERTERS ON AN EXISTING RES | Sugar Land | $9,000 |
| Sep 16, 2026 | RESIDENTIAL ELECTRICAL SERVICE | THE PROJECT INVOLVES INSTALLING A ROOF-MOUNTED PHOTOVOLTAIC SOLAR SYSTEM COMPRISING 30 AMPS SOLAR MODULES (12.300 KW DC / 8.850 KW AC) AND 15 DURACELL MICROINVE | Sugar Land | $12,000 |
| Sep 15, 2026 | SOLAR PANEL | 2913 LISA LN | Tyler | $6,000 |
| Sep 14, 2026 | SOLAR PANEL | 1403 W 6TH ST | Tyler | $10,000 |
Permit status
Where its permits stand, as the departments report them.
- Issued28
- Not stated8
- Closed6
- Expired6
- Finaled3
- Completed3
- C/o issued2
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.