Contractor · Electrical
TITUS ELECTRICAL SERVICES
57 building permits since 2003 in Boulder city, CO; Thornton city, CO and Broomfield County, CO, across 3 counties — $111,276 in reported job value over 47 permits that state one.
- Building permits
- 57
- Reported job value
- $111.3K
- Active
- 2003–2026
- Latest permit
- Aug 18, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Boulder city, CO34
- Thornton city, CO8
- Broomfield County, CO7
- Boulder County, CO6
- Brighton city, CO2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2003 | 1 |
| 2018 | 1 |
| 2020 | 1 |
| 2021 | 4 |
| 2022 | 12 |
| 2023 | 8 |
| 2024 | 5 |
| 2025 | 14 |
| 2026 (YTD) | 11 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical57
- Electric meters19
- EV chargers12
- Battery storage2
- Remodels2
- Roofing2
- Gas1
- HVAC1
- Additions1
- Plumbing1
Permit types
As the building departments classify them.
- Electrical Permit34
- Electrical10
- Electrical Service Change5
- B-Add/Alt Misc Electrical4
- B-Add/Alt Electric Service Change3
- Electrical Lift Station1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 18, 2026 | Electrical Permit | * Install customer-provided Level 2 Emporia EV charger directly below the main panel. There will be no conduit run, and the wiring will be directly within sight | Boulder | $2,373 |
| Aug 5, 2026 | Electrical | * Obtain all required electrical permits and coordinate all inspections with the local jurisdiction. * Install a new dedicated 50-amp GFCI breaker in the main e | Thornton | $2,307 |
| Jul 24, 2026 | Electrical Permit | Remove the existing main electrical panel and install a new 200-amp overhead service panel. ? Upgrade the overhead service equipment, including service entrance | Boulder | $5,418 |
| Jun 26, 2026 | Electrical | Scope of Work: Ceiling Fan Installation: * Provide and utilize large ladder for high-ceiling access (18 ft). * Provide additional technician for safe installati | Thornton | $2,483 |
| Apr 24, 2026 | Electrical | • Install new dedicated 50-amp, 240V circuit from the main exterior panel to the garage via crawl space • Install GFCI-protected 2-pole breaker to meet current | Thornton | $2,625 |
| Apr 23, 2026 | Electrical Permit | ? Remove existing meter and install new 200-amp lever bypass meter ? Install new service mast with weatherproof sleeve to properly secure utility conductors ? U | Boulder | $3,220 |
| Mar 5, 2026 | B-Add/Alt Electric Service Change | New 200 Amp Panel | Broomfield County | — |
| Feb 4, 2026 | Electrical Permit | Install a new main breaker in the existing basement subpanel. ? Reconfigure panel wiring as needed, including relocating breakers and installing tandem breakers | Boulder | $1,933 |
Permit status
Where its permits stand, as the departments report them.
- Completed32
- Void8
- Closed7
- Not stated7
- Active1
- Expired1
- Cancelled1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.