Contractor · Plumbing
Sara El Belle
58 building permits since 2018 in Peoria city, AZ and Mesa city, AZ — $13,300 in reported job value over 24 permits that state one.
- Building permits
- 58
- Reported job value
- $13.3K
- Active
- 2018–2026
- Latest permit
- Jan 14, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Peoria city, AZ33
- Mesa city, AZ25
Permits by year
By issue date (application date where there is none).
07.515
13
2019202120242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 3 |
| 2019 | 3 |
| 2020 | 13 |
| 2021 | 1 |
| 2023 | 1 |
| 2024 | 2 |
| 2025 | 1 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing49
- Gas28
- Pools & hot tubs10
- Electrical4
- Water heaters1
Permit types
As the building departments classify them.
- Residential33
- Plumbing25
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jan 14, 2026 | Plumbing | Like for like repair of 10 feet of existing PE gas line. Original permit for gas line was PMT19-03809 / Plumbing permit to repair existing gas line like for lik | Mesa | $500 |
| Sep 25, 2025 | Plumbing | Installation of 94-ft of 1-in PE gas line buried 18-in with 18-gauge tracer wire from gas meter to T, 3-ft of 1-in PE gas line from T to 65K BTU BBQ, 5-ft of 1- | Mesa | $500 |
| Oct 22, 2024 | Plumbing | INSTALLATION OF 30' OF 3/4" PE GASLINE BURIED 18" WITH 18 GAUGE TRACER WIRE FROM GAS STUB TO 65K BTU BBQ. ALL GASLINES TO BE INSTALLED PER 2018 IFGC & COM GAS R | Mesa | $500 |
| Oct 1, 2024 | Plumbing | INSTALLATION OF 107' OF 2" PE GASLINE BURIED 18" WITH 18 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GASLINES TO BE INSTALLED PER 2018 IFGC & | Mesa | $850 |
| Feb 13, 2023 | Plumbing | INSTALLATION OF 130' OF 1-1/2" PE GASLINE BURIED 18" WITH 18 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER. ALL GASLINES TO BE INSTALLED PER 2018 IFG | Mesa | $500 |
| Jun 8, 2021 | Plumbing | INSTALL NEW GAS LINES: [G1] 105 FT OF 1" PE GAS PIPE FROM METER TO 35K BTU FIRE PIT. [G2] 5' OF 1" PE GAS PIPE T'D FROM MAIN GAS LINE TO 65L BTU BBQ. ALL GAS LI | Mesa | $550 |
| Dec 29, 2020 | Plumbing | INSTALL NEW GAS LINES: [G1] 80 FT OF 2" BLACK IRON FROM METER, INSTALLED THROUGH INTERIOR OF DWELLING, TO 2" GAS STUB. [G2] 20 FT OF 2" PE GAS PIPE FROM 2" STUB | Mesa | $550 |
| Dec 22, 2020 | Plumbing | INSPECTOR TO DETERMINE LENGTH OF GAS LINE: 2" PE GAS PIPING FROM METER TO 400K BTU POOL HEATER. # 18 YELLOW TRACER WIRE. A MINIMUM OF 18" GROUND COVER. TO BE IN | Mesa | $550 |
Permit status
Where its permits stand, as the departments report them.
- Finaled23
- C/o issued23
- Issued8
- Closed1
- Expired1
- Pending payment1
- Reviews in progress1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.