Contractor · Specialty (solar, fire, telecom)

DELTA SOLAR ELECTRIC INC

58 building permits since 2010 in San Diego County, CA; Vista city, CA and Oceanside city, CA.

Building permits
58
Reported job value
—
Active
2010–2023
Latest permit
Aug 28, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • San Diego County, CA54
  • Vista city, CA3
  • Oceanside city, CA1

Permits by year

By issue date (application date where there is none).

07.515
11
201120132015201920212023
View as table
YearPermits
20101
20113
20121
20138
201411
20157
20186
20199
20201
20217
20221
20233

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar58
  • Electrical3

Permit types

As the building departments classify them.

  • Existing28
  • Building Misc - Photovoltaic System (PV)2
  • BLD SOLAR PV RES1
  • ELECTRIC PERMIT1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 28, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Jul 25, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Jun 25, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Jan 12, 2022—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—
Nov 21, 2021—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—
Oct 15, 2021—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—
Sep 23, 2021BLD SOLAR PV RES7.7KW, ROOF MOUNT PV, 24 MODS, 1 INVERTEROceanside City—
Aug 31, 2021—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—

Permit status

Where its permits stand, as the departments report them.

  • Completed42
  • Issued7
  • Active4
  • Finaled4
  • Expired1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.