Contractor · Electrical
SAULO D QUEIROZ
59 building permits since 2017 in Greenwich town, CT; Trumbull town, CT and Monroe town, CT, across 2 counties — $115,705 in reported job value over 49 permits that state one.
- Building permits
- 59
- Reported job value
- $115.7K
- Active
- 2017–2026
- Latest permit
- Oct 21, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Greenwich town, CT38
- Trumbull town, CT18
- Monroe town, CT2
- Ridgefield town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 1 |
| 2021 | 6 |
| 2022 | 2 |
| 2023 | 13 |
| 2024 | 13 |
| 2025 | 13 |
| 2026 (YTD) | 11 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical55
- EV chargers35
- Electric meters12
- HVAC3
- Generators3
- Bathrooms2
- Kitchens1
- Remodels1
- Windows & doors1
- Pools & hot tubs1
Permit types
As the building departments classify them.
- EL229
- Residential Electrical Permit19
- ELE9
- Commercial Electrical Permit1
- Electrical Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 21, 2026 | EL2 | replace existing Rivian charger, and add Generac load shed module (in garage) | Greenwich Town | $799 |
| Sep 16, 2026 | Commercial Electrical Permit | Property already has chargers. We are removing the existing chargers and putting 4 new 40A Autel charger in the exact same spot using the existing circuit. | Trumbull Town | $4,395 |
| Aug 14, 2026 | EL2 | Install 48 amp. Tesla charger inside garage controlled by a load management meter | Greenwich Town | $1,490 |
| Jul 22, 2026 | EL2 | Install 48 a Tesla charger in garage from the non-generator 200 amp. panel, controlled by a load management meter. | Greenwich Town | $2,959 |
| Jul 7, 2026 | EL2 | Install EV chargers on a pedestal near driveway from 200 amp. panel | Greenwich Town | $2,800 |
| Jun 2, 2026 | EL2 | Install (1) 48 amp. Tesla EV charger on exterior siding from 200 amp. panel protected by load management meter | Greenwich Town | $1,500 |
| Jun 2, 2026 | EL2 | Install (1) 48 amp. Tesla EV charger on exterior siding from subpanel protected by load management meter | Greenwich Town | $1,500 |
| Apr 27, 2026 | Residential Electrical Permit | Replacing panel | Trumbull Town | $2,975 |
Permit status
Where its permits stand, as the departments report them.
- Completed50
- Active8
- Void1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.