Contractor · Electrical

ECOSAVE GROUP

59 building permits since 2026 in Haverhill city, MA; Lunenburg town, MA and Marlborough city, MA, across 9 counties — $1,024,685 in reported job value over 50 permits that state one.

Building permits
59
Reported job value
$1M
Active
2026
Latest permit
Oct 29, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Haverhill city, MA13
  • Lunenburg town, MA7
  • Marlborough city, MA6
  • Beverly city, MA3
  • Springfield city, MA3
  • Portsmouth city, NH3
  • Brewster town, MA2
  • North Andover town, MA2
  • Monson town, MA2
  • Everett city, MA2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical26
  • Solar23
  • HVAC17
  • Roofing8
  • Remodels7
  • Windows & doors6
  • Heat pumps4
  • Battery storage1
  • Bathrooms1

Permit types

As the building departments classify them.

  • Building Permit10
  • Electrical Permit10
  • Building Permit: RESIDENTIAL Renovate or Remodel6
  • Electrical Permit - RESIDENTIAL ONLY6
  • Building Permit Application - One & Two Family3
  • Building Permit - Short Form3
  • Electrical Permit Application3
  • Electrical Permit - Commercial3

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 29, 2026*Building PermitInsulation, air sealing, and roof ventilation, including installing 9" floored R-28 dense-pack cellulose across the flat attic area (289 units), applying 2" rigNorth Andover Town$2,500
Oct 29, 2026Electrical Permit - Residential 1 & 2 Family—Marlborough City$25,550
Oct 28, 2026Building Permit - Residential 1 & 2 FamilyPV System Install: 14.520 kW-DC; 10.560 kW-AC; 33 Modules; 33 Microinverters; Roof-Mounted; NO Structural; NO ESS.Marlborough City$36,500
Oct 27, 2026Electrical Permit Application—Hudson Town$26,276
Oct 26, 2026Building PermitAttic flat insulation with R-33 open-cell cellulose, basement sill rigid board insulation, and soffit vent installation. Additional air-sealing measures includeSouthborough Town—
Oct 20, 2026Building Permit Application - One & Two FamilyGeneral and transition air sealing to prevent drafts, insulating the basement sills with 6" fiberglass, and fully insulating the attic kneewall space using 2" rSpringfield City$2,400
Oct 19, 2026Electrical PermitElectrical connection for HVAC installation: 1 Outdoor Heat Pump Condenser (4 TON) and 6 Indoor Ductless Wall Mount Units, including disconnect and dedicated ciWinthrop Town City$22,000
Oct 19, 2026Electrical Permit ApplicationNoArlington Town$30,000

Permit status

Where its permits stand, as the departments report them.

  • Active49
  • Completed8
  • Stop work ordered2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.