Contractor · Electrical
ECOSAVE GROUP
59 building permits since 2026 in Haverhill city, MA; Lunenburg town, MA and Marlborough city, MA, across 9 counties — $1,024,685 in reported job value over 50 permits that state one.
- Building permits
- 59
- Reported job value
- $1M
- Active
- 2026
- Latest permit
- Oct 29, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Haverhill city, MA13
- Lunenburg town, MA7
- Marlborough city, MA6
- Beverly city, MA3
- Springfield city, MA3
- Portsmouth city, NH3
- Brewster town, MA2
- North Andover town, MA2
- Monson town, MA2
- Everett city, MA2
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical26
- Solar23
- HVAC17
- Roofing8
- Remodels7
- Windows & doors6
- Heat pumps4
- Battery storage1
- Bathrooms1
Permit types
As the building departments classify them.
- Building Permit10
- Electrical Permit10
- Building Permit: RESIDENTIAL Renovate or Remodel6
- Electrical Permit - RESIDENTIAL ONLY6
- Building Permit Application - One & Two Family3
- Building Permit - Short Form3
- Electrical Permit Application3
- Electrical Permit - Commercial3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 29, 2026 | *Building Permit | Insulation, air sealing, and roof ventilation, including installing 9" floored R-28 dense-pack cellulose across the flat attic area (289 units), applying 2" rig | North Andover Town | $2,500 |
| Oct 29, 2026 | Electrical Permit - Residential 1 & 2 Family | — | Marlborough City | $25,550 |
| Oct 28, 2026 | Building Permit - Residential 1 & 2 Family | PV System Install: 14.520 kW-DC; 10.560 kW-AC; 33 Modules; 33 Microinverters; Roof-Mounted; NO Structural; NO ESS. | Marlborough City | $36,500 |
| Oct 27, 2026 | Electrical Permit Application | — | Hudson Town | $26,276 |
| Oct 26, 2026 | Building Permit | Attic flat insulation with R-33 open-cell cellulose, basement sill rigid board insulation, and soffit vent installation. Additional air-sealing measures include | Southborough Town | — |
| Oct 20, 2026 | Building Permit Application - One & Two Family | General and transition air sealing to prevent drafts, insulating the basement sills with 6" fiberglass, and fully insulating the attic kneewall space using 2" r | Springfield City | $2,400 |
| Oct 19, 2026 | Electrical Permit | Electrical connection for HVAC installation: 1 Outdoor Heat Pump Condenser (4 TON) and 6 Indoor Ductless Wall Mount Units, including disconnect and dedicated ci | Winthrop Town City | $22,000 |
| Oct 19, 2026 | Electrical Permit Application | No | Arlington Town | $30,000 |
Permit status
Where its permits stand, as the departments report them.
- Active49
- Completed8
- Stop work ordered2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.