Contractor · Electrical
William Deak
598 building permits since 2017 in New Fairfield town, CT; Ridgefield town, CT and Brookfield town, CT, across 5 counties — $5,936,834 in reported job value over 593 permits that state one.
- Building permits
- 598
- Reported job value
- $5.9M
- Active
- 2017–2026
- Latest permit
- Oct 29, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- New Fairfield town, CT169
- Ridgefield town, CT136
- Brookfield town, CT121
- New Milford town, CT106
- Redding town, CT49
- Stamford town, CT5
- Winchester town, CT2
- New Canaan town, CT2
- Dover town, NY2
- Pleasant Valley town, NY2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 10 |
| 2018 | 53 |
| 2019 | 24 |
| 2020 | 74 |
| 2021 | 82 |
| 2022 | 65 |
| 2023 | 75 |
| 2024 | 77 |
| 2025 | 63 |
| 2026 (YTD) | 75 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical534
- Generators520
- Electric meters18
- EV chargers16
- Pools & hot tubs13
- HVAC11
- Gas6
- Remodels5
- Plumbing5
- Heat pumps4
Permit types
As the building departments classify them.
- Electrical Permit369
- Generator Permit Application154
- Generator47
- Electrical Permit Application14
- Electrical (& Portable Generators)6
- Building Permit3
- Building Permit Application1
- Building Permit (No Trades)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 29, 2026 | Electrical Permit | 28 kw Generac standby generator with 200 Amp automatic transfer switch. Generator will be installed on the right side of the house near the front corner. | Brookfield Town | $16,000 |
| Oct 29, 2026 | Electrical Permit | Remove the existing 100 Amp meter box, service drop, and main electrical panel. Supply and install a new Square D Homeline 200 Amp 30-space panel with new circu | New Milford Town | $6,000 |
| Oct 29, 2026 | Electrical Permit | Install wiring for owner supplied Charge Point hardwired EV charger. A 30 Amp circuit will be installed for a 24 Amp maximum charge rate. The charger will be in | New Milford Town | $1,000 |
| Oct 29, 2026 | Electrical Permit | Supply and install a Charge Point hard wired EV charger located on the rear wall of the garage. A 60 Amp rated circuit will be installed for a 48 Amp maximum ch | New Milford Town | $3,000 |
| Oct 29, 2026 | Electrical Permit | Install a new circuit for new well pump installed by others. The circuit will run from an existing subpanel to the new well pump control box. | New Milford Town | $1,000 |
| Oct 27, 2026 | Electrical Permit | 24 kw Generac standby generator with 200 Amp automatic transfer switch. Generator will be installed on the right side of the house near the rear corner. A 20 in | Brookfield Town | $17,000 |
| Oct 27, 2026 | Electrical Permit | Existing underground service wiring from road to house went bad. Replace existing 200 Amp underground meter box with new 200 Amp overhead meter box. Install new | Brookfield Town | $2,000 |
| Oct 27, 2026 | Generator Permit Application | 24 kw Generac standby generator with 200 Amp automatic transfer switch. | New Fairfield Town | $17,516 |
Permit status
Where its permits stand, as the departments report them.
- Completed468
- Active117
- Stop work ordered9
- Closed2
- Not stated2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.