Contractor · Specialty (solar, fire, telecom)
PLANET SOLAR INCORPORATED
60 building permits since 2013 in Kings County, CA; Madera city, CA and Merced city, CA, across 9 counties — $980,730 in reported job value over 27 permits that state one.
- Building permits
- 60
- Reported job value
- $980.7K
- Active
- 2013–2026
- Latest permit
- Sep 3, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Kings County, CA16
- Madera city, CA14
- Merced city, CA11
- San Diego County, CA7
- Camarillo city, CA3
- Clovis city, CA2
- Los Angeles city, CA2
- Redlands city, CA2
- San Bernardino County, CA1
- Coalinga city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2013 | 5 |
| 2014 | 1 |
| 2015 | 3 |
| 2016 | 1 |
| 2017 | 5 |
| 2018 | 9 |
| 2019 | 8 |
| 2020 | 3 |
| 2021 | 4 |
| 2022 | 5 |
| 2023 | 7 |
| 2024 | 2 |
| 2025 | 3 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar58
- Roofing22
- Electrical10
- Plumbing6
- HVAC5
- Battery storage2
- New construction2
- Windows & doors1
Permit types
As the building departments classify them.
- 340-R15
- PHOTOVOLTAIC SYSTEMS6
- Electrical5
- RESPVSOLAR4
- Existing3
- RESIDENTIAL ROOFTOP SOLAR SYSTEM3
- 00 PHOTOVOLTAIC SYSTEMS2
- B-BSP Solar2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 3, 2026 | Solar | s a g . 8 o So a as e as 0 ba e es ALL INSPECTIONS MUST BE SCHEDULED THROUGH YOUR CIVIC ACCESS PORTAL. ALL INDIVIDUALS RESPONSIBLE FOR SCHEDULING INSPECTIONS MU | Merced City | $64,680 |
| Mar 11, 2026 | Electrical | Rooftop pv solar, comp shingle, 12 panels, 5.28kw, (n)12kw inverter, (n) 14.3kw ess - storage only, tied into an (e) 225/200a main service panel. | Clovis City | — |
| Mar 10, 2026 | Electrical | Rooftop pv solar, comp shingle, 12 panels, 5.28kw, (n)12kw inverter, (n) 14.3kw ess - storage only, tied into an (e) 225/200a main service panel. | Clovis City | — |
| Feb 25, 2026 | Electrical | 15.17 kw (dc) – roof mount– (37) modules– (37) microinverters – (e) 400a msp - 1 (n) ess | San Bernardino County | — |
| Sep 5, 2025 | 502 | ADD RES ELECT ESS TO EXISTING GND MNT SOLAR SYSTEM | Kings County | $14,900 |
| Aug 14, 2025 | SolarAPP | Install roof mount PV System on comp shingle, 29 panels, 11.89kw, (N)7.6kw Inverter, (N)10kw ESS - Storage Only (x2), tied into an (E) 125/100A main service pan | Merced City | $60,237 |
| Jan 29, 2025 | PHOTOVOLTAIC SYSTEMS | MISC INFO : ** 5.33kW 13 PANELS + BATTERY ** PHOTOVOLTAIC CONTRACTOR SHALL BE PRESENT AT TIME OF INSPECTION - CALL 209-723-2489. DO NOT COVER MECHANICAL OR PLUM | Merced City | $29,489 |
| Sep 9, 2024 | RESPVSOLAR | PV SOLAR 7.79KW W/BATTERY ESS | Madera City | $38,049 |
Permit status
Where its permits stand, as the departments report them.
- Not stated19
- Issued17
- Completed13
- Finaled9
- Active1
- Expired1
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- PLANET SOLAR INC
- PLANET SOLAR
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.