Contractor · HVAC
PATRICK MENTILLO
60 building permits since 2012 in Bethel Park municipality, PA.
- Building permits
- 60
- Reported job value
- —
- Active
- 2012
- Latest permit
- Sep 14, 2012
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Bethel Park municipality, PA60
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC33
- Telecom1
Permit types
As the building departments classify them.
- PAVED - OPENING60
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 14, 2012 | PAVED - OPENING | PURPOSE: VERIZON F.I.O.S. TOTAL LOOP LENGTH: 180' LOOP LENGTH DIRECT BURIED: 140' | Bethel Park | — |
| Sep 14, 2012 | PAVED - OPENING | PURPOSE: VERIZON F.I.O.S. TOTAL LOOP LENGTH: 118' LOOP LENGTH DIRECT BURIED: 60' | Bethel Park | — |
| Sep 14, 2012 | PAVED - OPENING | PURPOSE: VERIZON F.I.O.S. TOTAL LOOP LENGTH: 225 DUCT LENGTH IN PLACE: 180 | Bethel Park | — |
| Sep 14, 2012 | PAVED - OPENING | PURPOSE: VERIZON F.I.O.S. | Bethel Park | — |
| Aug 17, 2012 | PAVED - OPENING | PURPOSE: VERIZON F.I.O.S. TOTAL LOOP LENGTH: 260' LOOP LENGTH DIRECT BURIED: 220' | Bethel Park | — |
| Aug 17, 2012 | PAVED - OPENING | PURPOSE: VERIZON F.I.O.S. TOTAL LOOP LENGTH: 138' DUCT LENGTH IN PLACE: 80' | Bethel Park | — |
| Aug 17, 2012 | PAVED - OPENING | PURPOSE: VERIZION F.I.O.S. TOTAL LOOP LENGTH: 204' DUCT LENGTH IN PLACE: 80' LOOP LENGTH DIRECT BURIED: 55' | Bethel Park | — |
| Aug 6, 2012 | PAVED - OPENING | PURPOSE: VERIZON FIOS TOTAL LOOP LENGTH: 5'5 LOOP LENGTH DIRECT BURIED: 60 | Bethel Park | — |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.