Contractor · Electrical

NORTH BRUNSWICK ELECTRICAL CONTR

60 building permits since 2019 in Brunswick County, NC; Pender County, NC and Holden Beach town, NC, across 2 counties — $8,981,961 in reported job value over 20 permits that state one.

Building permits
60
Reported job value
$9M
Active
2019–2026
Latest permit
Mar 4, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Brunswick County, NC52
  • Pender County, NC5
  • Holden Beach town, NC1
  • Ocean Isle Beach town, NC1
  • Sunset Beach town, NC1

Permits by year

By issue date (application date where there is none).

07.515
13
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20192
20205
20219
20229
202310
202413
202510
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical52
  • Pools & hot tubs18
  • Electric meters5
  • Windows & doors2
  • Remodels1
  • Plumbing1
  • Water heaters1

Permit types

As the building departments classify them.

  • ELECTRICAL41
  • RECONNECT4
  • Commercial Electrical Stand Alone Permit3
  • Residential Electrical Stand Alone Permit2
  • CHANGE OUT ELECTRICAL1
  • CORRECTIVE ACTION1
  • Electrical1
  • FAILURE TO OBTAIN FINAL1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 4, 2026ELECTRICALInstall electrical service wit hgfci receptacle for the irrigation controller device. 120/240v 100 amperes.Brunswick County—
Feb 23, 2026Residential Repair/RemodelExtend an existing 240V 60A electric circuit to a new hot tub, replacing an existing older unit.Ocean Isle Beach—
Sep 5, 2025CORRECTIVE ACTIONElectrical inspection for project 657432 on 9/4/2025 revealed several code violations that will need to be remedied prior to power being restored to property. NBrunswick County$100
Aug 27, 2025ELECTRICALPower was previously disconnected due to failure to pay. Permit and inspection are required by Duke to get a new meter and turn power on. Electrical final inspeBrunswick County$100
Aug 19, 2025Residential Electrical Stand Alone PermitInstall a 200A electrical service for power a water pump for irrigation and hunting dog water, and to power a 40-foot storage container. The site is on the rivePender County—
Jul 25, 2025ELECTRICALRemove and replace existing 200-ampere 240V powerBrunswick County$1,000
Jul 25, 2025RECONNECTReconnectBrunswick County$1,000
Jul 14, 2025ELECTRICALReplace an existing defective/inoperable pool pump motorBrunswick County—

Permit status

Where its permits stand, as the departments report them.

  • Active52
  • Completed3
  • Void1
  • Closed1
  • Expired1
  • Pending1
  • Approved1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.