Contractor · Electrical

Nast

60 building permits since 2022 in Los Angeles city, CA.

Building permits
60
Reported job value
—
Active
2022–2023
Latest permit
May 19, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA60

Permits by year

By issue date (application date where there is none).

03060
55
20222023
View as table
YearPermits
202255
20235

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical60
  • Solar50
  • Roofing7

Permit types

As the building departments classify them.

  • Electrical60

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 19, 2023Electrical[E-Plan] New PV2 roof mounted solar system consisting of 9 AC modulesLos Angeles City—
May 1, 2023Electrical[eplan] Install 2.80 kW DC/ 2.5KW AC roof mounted PV system with (8)Los Angeles City—
May 1, 2023Electrical[eplan] Install 2.80 kW DC roof mounted PV system. (8) modules with mLos Angeles City—
Apr 28, 2023Electrical[ePlan] New roof-mounted solar PV system with (9) AC modules connectedLos Angeles City—
Apr 20, 2023Electrical[eplan] Install 3.15 kW roof mounted PV system. (9) modules with micrLos Angeles City—
Aug 4, 2022Electricale-plan. 6.30 kW PV system with 18 AC modules, and (1) load center.Los Angeles City—
Aug 3, 2022Electrical[EPLAN] PV1 NEW ROOFTOP MOUNTED SYSTEM, SYSTEM SIZE IS 5.67 KWac, SYSTLos Angeles City—
Jul 25, 2022Electrical(EPlan) PV1 PC for installation of roof mounted solar panels. PV sytemLos Angeles City—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.