Contractor · HVAC
Timothy Woods
61 building permits since 2017 in Lexington town, MA; Wellesley town, MA and Somerville city, MA, across 3 counties — $1,439,276 in reported job value over 57 permits that state one.
- Building permits
- 61
- Reported job value
- $1.4M
- Active
- 2017–2026
- Latest permit
- Oct 13, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Lexington town, MA20
- Wellesley town, MA17
- Somerville city, MA6
- Dedham town, MA6
- Arlington town, MA3
- Wayland town, MA2
- Bolton town, MA2
- Natick town, MA1
- Dover town, MA1
- Medfield town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 1 |
| 2019 | 5 |
| 2020 | 2 |
| 2021 | 4 |
| 2022 | 6 |
| 2023 | 11 |
| 2024 | 11 |
| 2025 | 9 |
| 2026 (YTD) | 12 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC59
- Heat pumps11
- Electrical11
- Gas10
- Bathrooms6
- Plumbing6
- Remodels5
- Kitchens4
- Additions4
Permit types
As the building departments classify them.
- Mechanical15
- Sheet Metal Permit12
- Building Permit - Residential7
- Mechanical Permit6
- Sheet Metal3
- Mechanical Permit Application2
- Building Permit - Sheet Metal1
- Gas1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 13, 2026 | Building Permit - Residential | REPLACEMENT OF THE FAILING LG HEAT PUMP EQUIPMENT SERVING THE 1 ST FLOOR/BASEMENT WITH A NEW MITSUBISHI COLD-CLIMATE APPROVED HEAT PUMP SYSTEM | Wellesley Town | $22,250 |
| Sep 17, 2026 | Sheet Metal Permit/Mechanical Permit | Replace one existing gas furnace, PERMIT REQUIRED TO BE ON SITE FOR INSPECTIONS | Medfield Town | $10,197 |
| Aug 26, 2026 | Mechanical Permit | — | Bolton Town | $122,500 |
| Aug 26, 2026 | Sheet Metal Permit | Install new supply and return duct work for two new heating and cooling systems. | Bolton Town | $40,000 |
| Aug 12, 2026 | Mechanical Permit | Replace one ac condenser | Dedham Town | $15,620 |
| Jul 28, 2026 | Mechanical Permit - Residential & Commercial Projects | Replace two ECM blower modules, two AC condensers, two hydro heating coils, and two coil modules serving the kitchen and living room. | Dover Town | $60,580 |
| Jul 1, 2026 | Building Permit - Residential | Replace one ac condenser and one air handler. | Wellesley Town | $19,440 |
| Jun 18, 2026 | Building Permit - Residential | Remove and Replace existing Luxaire Evaporator Coil and Condenser. | Wellesley Town | $12,000 |
Permit status
Where its permits stand, as the departments report them.
- Active33
- Completed20
- Issued5
- Closed1
- Expired1
- Stop work ordered1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.