Contractor · Electrical

GREENKEY RICHMOND VA LLC

607 building permits since 2023 in Chesterfield County, VA; Henrico County, VA and Richmond city, VA, across 6 counties — $638,201 in reported job value over 546 permits that state one.

Building permits
607
Reported job value
$638.2K
Active
2023–2026
Latest permit
Nov 2, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Chesterfield County, VA286
  • Henrico County, VA207
  • Richmond city, VA56
  • Albemarle County, VA51
  • Petersburg city, VA5
  • Amherst County, VA2

Permits by year

By issue date (application date where there is none).

0150300
251
2023202420252026*
* 2026 is year to date.
View as table
YearPermits
202360
202499
2025251
2026 (YTD)197

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical417
  • Remodels191
  • EV chargers166
  • HVAC5
  • Electric meters5
  • Windows & doors3
  • Heat pumps2
  • New construction2
  • Battery storage1
  • Grading & excavation1

Permit types

As the building departments classify them.

  • Residential Electrical285
  • Alteration123
  • New Installation65
  • ELEC PRMT (Residential) - Light Alteration or Remodel55
  • Residential - Electric43
  • Electrical Permit19
  • Electrical - Commercial8
  • Electrical5

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Nov 2, 2026ELEC PRMT (Residential) - Light Alteration or RemodelInstall an 80-amp subpanel in the detached garage. Install a 15-amp breaker for garage lighting and receptacle. Install a 50-amp breaker for a 40-amp EV chargerRichmond City—
Nov 2, 2026ELEC PRMT (Residential) - Light Alteration or RemodelInstall an 80-amp subpanel in the detached garage. Install a 50-amp breaker in the new subpanel for a 40-amp Grizzl-E charger (Charger to be installed inside ofRichmond City—
Oct 27, 2026ELEC PRMT (Residential) - Light Alteration or RemodelInstall a 60-amp breaker for a 48-amp ChargePoint charger to be mounted on a 4x4 post by their fence. #6 SEU to be run from the panel and through the crawlspaceRichmond City—
Oct 20, 2026Residential - ElectricInstall a 60-amp breaker for a 48-amp ChargePoint charger to be mounted on the exterior of the garage. #6 THHN in conduit from the panel to the charger.Albemarle County$585
Oct 20, 2026Residential ElectricalInstall a 60-amp breaker for a 48-amp Emporia charger to be mounted in the garage. #6 THHN in conduit from the panel to the charger.Chesterfield County$1,035
Oct 20, 2026Residential ElectricalInstall a 60-amp breaker for a 48-amp Emporia charger to be mounted on the exterior of the house. #6 SEU from the panel, into the crawlspace, and to the chargerChesterfield County$805
Oct 13, 2026Residential ElectricalInstall a 60-amp breaker for a 48-amp Tesla Wall Connector to be mounted on the exterior of the house. #6 THHN in conduit from the panel to the charger.Chesterfield County$1,495
Oct 13, 2026Residential ElectricalInstall a 60-amp breaker for a 48-amp Emporia Pro charger to be mounted on the exterior of the house. #6 THHN in conduit to be run from the panel to the chargerChesterfield County$595

Permit status

Where its permits stand, as the departments report them.

  • Issued303
  • Completed198
  • Finaled45
  • C/o issued44
  • Expired6
  • Approved4
  • Cancelled4
  • Closed2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.