Contractor · Electrical

Robert McNamara

61 building permits since 2017 in East Providence city, RI; Warwick city, RI and West Warwick town, RI, across 5 counties — $1,592,596 in reported job value over 56 permits that state one.

Building permits
61
Reported job value
$1.6M
Active
2017–2026
Latest permit
Sep 28, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • East Providence city, RI22
  • Warwick city, RI5
  • West Warwick town, RI5
  • Cranston city, RI5
  • Providence city, RI5
  • North Kingstown town, RI4
  • Barrington town, RI3
  • East Greenwich town, RI2
  • Newport city, RI2
  • North Smithfield town, RI2

Permits by year

By issue date (application date where there is none).

07.515
11
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20172
20187
201911
20206
20217
202210
20234
20247
20253
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical61
  • Demolition11
  • HVAC7
  • Generators5
  • Electric meters4
  • Gas3
  • Bathrooms3
  • Windows & doors3
  • Remodels2
  • EV chargers2

Permit types

As the building departments classify them.

  • Electrical Permit54
  • 2) Electrical Permit5
  • EG Electrical Permit2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 28, 2026Electrical Permit—South Kingstown Town—
Sep 22, 2026Electrical Permit—North Kingstown Town—
Aug 4, 2026Electrical Permit1. Assist in creation of plan to relocate dynamometer and associated equipment to Automotive facility. 2. Demo existing lighting fixtures under mezzanine 3. InsWarwick City$95,000
Apr 1, 2026EG Electrical PermitPerform all electrical work per attached plansEast Greenwich Town$80,000
Aug 28, 2025Electrical Permit1. Demo two existing cables in pipe from old controller to existing pumps. 2. Demo existing duplex pump control panel and remove. 3. Design and install structurNorth Smithfield Town$18,000
Jul 21, 2025Electrical PermitReplace 4 Rusted NEMA 3R 200 amp 3 phase 600 volt Non-fuse disconnects on existing rooftop blower units.Providence City$12,000
Jan 28, 2025Electrical Permit1. Install new 100amp, single phase, 120/240V aerial underground service to feed new pump station control panel. 2. Install one pre-assembled pump station contrCumberland Town$40,000
Dec 9, 2024Electrical Permit1. Install two 70 amp 480 volt 3 phase feeds to two new pad mount heating systems. 2. Assemble prefabricated power/control wiring systems on two new pad mount hEast Providence City$40,000

Permit status

Where its permits stand, as the departments report them.

  • Completed35
  • Active19
  • Stop work ordered7

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.