Contractor · HVAC

Manoel Lemes

61 building permits since 2016 in Wellesley town, MA; Arlington town, MA and Hudson town, MA, across 8 counties — $2,336,396 in reported job value over 50 permits that state one.

Building permits
61
Reported job value
$2.3M
Active
2016–2026
Latest permit
Aug 18, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Wellesley town, MA5
  • Arlington town, MA4
  • Hudson town, MA4
  • Marlborough city, MA4
  • Wareham town, MA4
  • Lexington town, MA3
  • Quincy city, MA3
  • Norwell town, MA3
  • Sutton town, MA3
  • Easton town, MA2

Permits by year

By issue date (application date where there is none).

0510
10
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20162
20184
20193
20206
20217
20226
20235
202410
20259
2026 (YTD)9

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC58
  • Demolition15
  • Heat pumps14
  • Gas5
  • Kitchens4
  • Bathrooms4
  • Additions3
  • Roofing1
  • Plumbing1
  • Electrical1

Permit types

As the building departments classify them.

  • Sheet Metal Permit14
  • SHT MTL6
  • MECH4
  • Mechanical and Sheet Metal Permit Application4
  • Mechanical Permit4
  • Building Permit Application3
  • Mechanical Permit Application3
  • Sheet Metal & Mechanical Permit3

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 18, 2026Mechanical Permit ApplicationInstall one 12,000 Btuh Horizontal Concealed Ducted Indoor Unit supplying bedrooms. Install one 9,000 Btuh Ceiling Cassette Indoor Unit supplying kitchen and diArlington Town$43,335
Aug 18, 2026Mechanical Permit ApplicationInstall one 18,000 Btuh Horizontal Concealed Ducted Indoor Unit supplying 2nd floor. Install one 18,000 Btuh Horizontal Concealed Ducted Indoor Unit supplying 3Arlington Town$33,335
Aug 3, 2026Mechanical and Sheet Metal Permit ApplicationINSTALLATION OF NEW EXHAUST SYSTEM AS PER SCOPE OF WORKHudson Town$49,140
Jul 30, 2026Mechanical Permit - ResidentialInstall one air handler with ductwork in attic to supply first floor. Install one heat pump outside to supply indoor unitMarlborough City$22,650
Jun 9, 2026Mechanical Permit ApplicationInstallation of a Mitsubishi Hyper-Heat multi-zone system serving the new addition of the house. We propose the supply and installation of a Mitsubishi multi-zoArlington Town$16,200
Jun 2, 2026MECH—Attleboro City—
Mar 19, 2026Sheet Metal PermitInstall all ductwork as shown in latest mechanical drawings (11/12/2025) Install 3 EFs and Wall CapsWareham Town$4,850
Jan 27, 2026Building Permit - Sheet MetalDemo all ductwork as shown in latest mechanical drawings Install all ductwork as shown in latest mechanical drawingsAmherst Town City$7,700

Permit status

Where its permits stand, as the departments report them.

  • Completed38
  • Active15
  • Issued4
  • Closed3
  • Finaled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.