Contractor · HVAC
Manoel Lemes
61 building permits since 2016 in Wellesley town, MA; Arlington town, MA and Hudson town, MA, across 8 counties — $2,336,396 in reported job value over 50 permits that state one.
- Building permits
- 61
- Reported job value
- $2.3M
- Active
- 2016–2026
- Latest permit
- Aug 18, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Wellesley town, MA5
- Arlington town, MA4
- Hudson town, MA4
- Marlborough city, MA4
- Wareham town, MA4
- Lexington town, MA3
- Quincy city, MA3
- Norwell town, MA3
- Sutton town, MA3
- Easton town, MA2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 2 |
| 2018 | 4 |
| 2019 | 3 |
| 2020 | 6 |
| 2021 | 7 |
| 2022 | 6 |
| 2023 | 5 |
| 2024 | 10 |
| 2025 | 9 |
| 2026 (YTD) | 9 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC58
- Demolition15
- Heat pumps14
- Gas5
- Kitchens4
- Bathrooms4
- Additions3
- Roofing1
- Plumbing1
- Electrical1
Permit types
As the building departments classify them.
- Sheet Metal Permit14
- SHT MTL6
- MECH4
- Mechanical and Sheet Metal Permit Application4
- Mechanical Permit4
- Building Permit Application3
- Mechanical Permit Application3
- Sheet Metal & Mechanical Permit3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 18, 2026 | Mechanical Permit Application | Install one 12,000 Btuh Horizontal Concealed Ducted Indoor Unit supplying bedrooms. Install one 9,000 Btuh Ceiling Cassette Indoor Unit supplying kitchen and di | Arlington Town | $43,335 |
| Aug 18, 2026 | Mechanical Permit Application | Install one 18,000 Btuh Horizontal Concealed Ducted Indoor Unit supplying 2nd floor. Install one 18,000 Btuh Horizontal Concealed Ducted Indoor Unit supplying 3 | Arlington Town | $33,335 |
| Aug 3, 2026 | Mechanical and Sheet Metal Permit Application | INSTALLATION OF NEW EXHAUST SYSTEM AS PER SCOPE OF WORK | Hudson Town | $49,140 |
| Jul 30, 2026 | Mechanical Permit - Residential | Install one air handler with ductwork in attic to supply first floor. Install one heat pump outside to supply indoor unit | Marlborough City | $22,650 |
| Jun 9, 2026 | Mechanical Permit Application | Installation of a Mitsubishi Hyper-Heat multi-zone system serving the new addition of the house. We propose the supply and installation of a Mitsubishi multi-zo | Arlington Town | $16,200 |
| Jun 2, 2026 | MECH | — | Attleboro City | — |
| Mar 19, 2026 | Sheet Metal Permit | Install all ductwork as shown in latest mechanical drawings (11/12/2025) Install 3 EFs and Wall Caps | Wareham Town | $4,850 |
| Jan 27, 2026 | Building Permit - Sheet Metal | Demo all ductwork as shown in latest mechanical drawings Install all ductwork as shown in latest mechanical drawings | Amherst Town City | $7,700 |
Permit status
Where its permits stand, as the departments report them.
- Completed38
- Active15
- Issued4
- Closed3
- Finaled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.