Contractor · Roofing
Luis Cardona
61 building permits since 2017 in Providence city, RI; Cranston city, RI and Pawtucket city, RI, across 4 counties — $448,417 in reported job value over 60 permits that state one.
- Building permits
- 61
- Reported job value
- $448.4K
- Active
- 2017–2026
- Latest permit
- Oct 13, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Providence city, RI29
- Cranston city, RI12
- Pawtucket city, RI5
- Warwick city, RI3
- North Providence town, RI3
- Lincoln town, RI2
- Barrington town, RI1
- Central Falls city, RI1
- East Providence city, RI1
- Johnston town, RI1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 3 |
| 2018 | 11 |
| 2019 | 11 |
| 2020 | 7 |
| 2021 | 7 |
| 2022 | 3 |
| 2023 | 2 |
| 2025 | 1 |
| 2026 (YTD) | 16 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Roofing40
- Windows & doors9
- Remodels2
- HVAC1
- Kitchens1
- Additions1
- Bathrooms1
- Plumbing1
- Electrical1
Permit types
As the building departments classify them.
- Building Permit30
- Roofing Permit17
- 1) Building Permit12
- Siding Permit2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 13, 2026 | Building Permit | Install exterior stairs coming down from 2nd floor deck to back yard. | Providence City | $3,500 |
| Sep 25, 2026 | Building Permit | Replace 19 replacement windows. | Johnston Town | $5,700 |
| Sep 23, 2026 | Building Permit | replace first and second floor railing 42'' high and replace the floor board 1x6 pressure thread lumber. | Providence City | $10,000 |
| Sep 18, 2026 | 1) Building Permit | Installation of drywall over existing wall on the 3rd floor. Apt 3F | Cranston City | $9,000 |
| Sep 16, 2026 | Building Permit | For interior alterations to establish use as a single family dwelling in an existing detached structure. SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICA | Providence City | $25,000 |
| Sep 15, 2026 | 1) Building Permit | Install drywall over the existing drywall 1st and 3rd floors | Cranston City | $10,000 |
| Sep 8, 2026 | Building Permit | Install aluminum and vinyl siding around soffit and all the windows molding. | Pawtucket City | $5,000 |
| Aug 26, 2026 | Building Permit | Replace deck's floor board and railings. Front size 25 x 8 Back size 12 x 12 | Woonsocket City | $15,000 |
Permit status
Where its permits stand, as the departments report them.
- Active36
- Completed21
- Stop work ordered4
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.