Contractor · Plumbing

Lane Engineering Marine Permits

61 building permits since 2025 in Talbot County, MD and Dorchester County, MD, across 2 counties — $5,801,368 in reported job value over 60 permits that state one.

Building permits
61
Reported job value
$5.8M
Active
2025–2026
Latest permit
Oct 26, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Talbot County, MD60
  • Dorchester County, MD1

Permits by year

By issue date (application date where there is none).

03060
55
20252026*
* 2026 is year to date.
View as table
YearPermits
20256
2026 (YTD)55

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing37
  • Grading & excavation4
  • Roofing1
  • Demolition1

Permit types

As the building departments classify them.

  • Marine Construction / Shoreline Stabilization Permit60
  • Building Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 26, 2026Marine Construction / Shoreline Stabilization Permit1. Stabilize 85 linear feet of eroding shoreline with beach nourishment and two stone sills 2. Place 16 linear feet of riprap around the existing pier.Talbot County$65,500
Oct 26, 2026Marine Construction / Shoreline Stabilization PermitConstruct 750 feet of low profile stone edging extending a maximum of 16 ft channelward of an eroding marsh edge, in accordance with State Wetlands License No. Talbot County$175,000
Oct 25, 2026Marine Construction / Shoreline Stabilization PermitStabilize 5,067 linear feet of shoreline with a combination of living shoreline and beach nourishment. All landward disturbance to the site will be temporary anTalbot County$750,000
Oct 25, 2026Marine Construction / Shoreline Stabilization PermitStabilize 360 linear feet of shoreline with a living shoreline and 200 linear feet of shoreline with riprap.Talbot County$100,000
Oct 2, 2026Marine Construction / Shoreline Stabilization PermitConstruct a 160-foot long by 6-foot wide timber pier, one boat lift with assocaited piles, and 4 mooring piles, all within a maximum of 150 feet channelward of Talbot County$46,000
Oct 2, 2026Marine Construction / Shoreline Stabilization PermitStabilize 160 linear feet of shoreline with riprap.Talbot County$80,000
Oct 2, 2026Marine Construction / Shoreline Stabilization PermitRepair and maintain 140 linear feet of existing riprap within its current footprint.Talbot County$10,000
Sep 16, 2026Marine Construction / Shoreline Stabilization PermitRemove an existing pier and associated structures prior to commencement of construction. Construct a 130 ft long by 6 ft wide timber pier with a 10 ft long by 2Talbot County$35,000

Permit status

Where its permits stand, as the departments report them.

  • Active48
  • Completed13

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.