Contractor · Electrical

ELIONE ENERGY INC

61 building permits since 2021 in Los Angeles city, CA; Anaheim city, CA and Fullerton city, CA, across 3 counties — $470,600 in reported job value over 3 permits that state one.

Building permits
61
Reported job value
$470.6K
Active
2021–2026
Latest permit
Apr 7, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA49
  • Anaheim city, CA4
  • Fullerton city, CA3
  • Riverside city, CA3
  • Brea city, CA1
  • Garden Grove city, CA1

Permits by year

By issue date (application date where there is none).

012.525
25
20212022202320242026*
* 2026 is year to date.
View as table
YearPermits
202114
202225
202312
20241
2026 (YTD)7

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical53
  • Solar15
  • Roofing5
  • Battery storage4
  • EV chargers2
  • Accessory dwelling units1

Permit types

As the building departments classify them.

  • Electrical51
  • NON-SOLAR APP+ Single Family Dwelling or Duplex Residential - Solar Photovoltaic Energy Systems2
  • Residential2
  • Commercial1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 7, 2026—INSTALL (N) ROOF MOUNTED PVS 2.640KW AND (6) PANELS FOR ADUGarden Grove City$10,500
Mar 25, 2026ElectricalInstallation of roof mounted solar pv system with battery. Size: 8.800 kw/dc, (20) 440w modules, (1) inverter. (1) battery (13.5 kwh)Brea City—
Mar 17, 2026NON-SOLAR APP+ Single Family Dwelling or Duplex Residential - Solar Photovoltaic Energy SystemsINSTALL ROOF MOUNTED PV SOLAR - 13.2KW, 30 MODULES, 1 INVERTER INSTALL (2) (N) 13.5KW ESS BACKUP BATTERY MAXIMUM ANCHOR SPACING = 4-FT. OTHERWISE, PLANS SHALL BFullerton City—
Feb 19, 2026NON-SOLAR APP+ Single Family Dwelling or Duplex Residential - Solar Photovoltaic Energy SystemsINSTALL (N) ROOF MOUNTED PV SOLAR - 7.92KW, (18) MODULES, AND (1) INVERTER (N) 13.5KWH ESS BATTERY AS PER APPROVED PLANSFullerton City—
Feb 9, 2026CommercialINSTALL PV SOLAR SYSYEM WITH (282) PHOTOVOLTAIC PANELS ON COMMERCIAL ROOF - 174.84 KWRiverside City$436,600
Jan 26, 2026ElectricalInstallation of a roof-mounted microinverter/ac module solar photovoltaic (pv) system, not exceeding 38.4kw in a 1 or 2 family dwelling.Los Angeles City—
Jan 13, 2026ElectricalInstall (n) roof mounted pv solar - 5.395kw, (13) modules, and (1) inverter (n) 13.5kwh ess battery as per approved plansFullerton City—
Nov 6, 2024—Photovoltaic System: Install Roof Mounted Solar With (26) Models And (26) Mirco InvertersAnaheim City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated52
  • Completed3
  • Active2
  • Finaled2
  • Additional information required2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.