Contractor · Plumbing
Cox Electric LLC
61 building permits since 2013 in North Kingstown town, RI; Plainfield town, CT and Thompson town, CT, across 3 counties — $307,400 in reported job value over 43 permits that state one.
- Building permits
- 61
- Reported job value
- $307.4K
- Active
- 2013–2026
- Latest permit
- Nov 2, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- North Kingstown town, RI18
- Plainfield town, CT13
- Thompson town, CT8
- Putnam town, CT6
- Brooklyn town, CT5
- Pomfret town, CT4
- Sterling town, CT3
- Voluntown town, CT3
- Colchester town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2013 | 7 |
| 2014 | 11 |
| 2022 | 4 |
| 2023 | 3 |
| 2024 | 11 |
| 2025 | 13 |
| 2026 (YTD) | 11 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Generators43
- HVAC42
- Gas37
- Plumbing27
- Electrical17
Permit types
As the building departments classify them.
- Mechanical40
- Electrical Permit16
- Fuel Gas2
- Mechanical Permit2
- Electrical1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 2, 2026 | Mechanical | Supply labor and materials for the installation of a 18kw Generac home standby generator which will be located on a precast concrete pad. We will be piping appr | Thompson Town | $11,000 |
| Nov 2, 2026 | Mechanical | Supply labor and materials for the installation of a 18kw Generac home standby generator which will be located on a precast concrete pad. We will be piping appr | Plainfield Town | $11,500 |
| Nov 2, 2026 | Mechanical | Supply labor and materials for the installation of a 14kw Generac home standby generator which will be located on a precast concrete pad. We will be piping appr | Plainfield Town | $11,000 |
| Sep 29, 2026 | Mechanical | Supply labor and materials for the installation of a 18kw Generac home standby generator which will be located on a pre cast concrete pad. We will be piping app | Thompson Town | $11,000 |
| Aug 28, 2026 | Mechanical | Supply labor and materials to run a gas line approximately 35' from propane tanks through a trench to a new 24kw Generac home standby generator which will be lo | Sterling Town | $12,500 |
| Aug 3, 2026 | Mechanical | Supply labor and materials to run a gas line exterior mount 15' from propane over to a new 24kw generac home standby generator which will be located on a pre ca | Putnam Town | $11,000 |
| Jul 1, 2026 | Mechanical | Supply labor and material to run 20' of exterior mounted black iron gas line from propane tanks over to a 22kw home standby generator that will be located on a | Thompson Town | $10,000 |
| Mar 25, 2026 | Mechanical | Supply labor and materials for the installation of a 22kw home standby generator which will be located on a pre cast concrete pad. We will be piping 40 Ft run f | Voluntown Town | $9,500 |
Permit status
Where its permits stand, as the departments report them.
- Approved25
- Closed16
- Active15
- Completed4
- New1
Also on file as
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.