Contractor · Electrical

CLC ELECTRICAL SOLUTIONS LLC

61 building permits since 2025 in Elk Grove city, CA; Sacramento city, CA and Folsom city, CA — $94,663 in reported job value over 60 permits that state one.

Building permits
61
Reported job value
$94.7K
Active
2025–2026
Latest permit
Oct 14, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Elk Grove city, CA47
  • Sacramento city, CA13
  • Folsom city, CA1

Permits by year

By issue date (application date where there is none).

02040
38
20252026*
* 2026 is year to date.
View as table
YearPermits
202523
2026 (YTD)38

Type of work

Permits describing each kind of work; one permit can cover several.

  • EV chargers50
  • Electrical42
  • Pools & hot tubs1

Permit types

As the building departments classify them.

  • ONLINE VEHICLE CHARGING PERMIT43
  • Single Family13
  • ELECTRICAL2
  • Electrical1
  • ONLINE RESIDENTIAL ELECTRICAL1
  • SWIMMING POOL1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 14, 2026ELECTRICALINSTL TESLA EV CHARGER IN GARAGEElk Grove City$750
Oct 6, 2026ONLINE VEHICLE CHARGING PERMITInstallation of Tesla Wall Charger (Hardwired)Elk Grove City$870
Sep 1, 2026Single FamilyEV Charger Permit: Installation of Nema 14-50 Receptacle for Amilier Level 2 EV Charger (Residential). Water conserving fixtures are required to be installed thSacramento$1,050
Aug 24, 2026Single FamilyElectrical Permit: Change out of a main electrical panel from 125 amps to 200 amps with service overhead. Carbon monoxide & Smoke alarms required. Reference CRCSacramento$8,000
Jul 29, 2026ONLINE VEHICLE CHARGING PERMITInstallation of Tesla Wall Charger Gen 3Elk Grove City$850
Jul 27, 2026ONLINE VEHICLE CHARGING PERMITInstallation of TurnOn Green EV700 Charger EVSE (Hardwired)Elk Grove City$950
Jul 20, 2026Single FamilyEPC - EV Charger Permit: Installation of Enphase IQ40 (w/ built-in GFCI) Hardwired / 240V, 40Amps EV Charger. Water conserving fixtures are required to be instaSacramento$950
Jul 16, 2026ONLINE VEHICLE CHARGING PERMITInstallation of ChargePointFlex Level2 EV Charger(hardwired)Elk Grove City$1,150

Permit status

Where its permits stand, as the departments report them.

  • Closed32
  • Issued28
  • Finaled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.