Contractor · Plumbing
Anthony Paliotta
612 building permits since 2017 in Providence city, RI; Pawtucket city, RI and East Providence city, RI, across 5 counties — $6,542,466 in reported job value over 530 permits that state one.
- Building permits
- 612
- Reported job value
- $6.5M
- Active
- 2017–2026
- Latest permit
- Oct 28, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Providence city, RI252
- Pawtucket city, RI41
- East Providence city, RI40
- Warwick city, RI38
- Narragansett town, RI33
- Cranston city, RI31
- North Kingstown town, RI29
- Warren town, RI16
- Barrington town, RI15
- Cumberland town, RI14
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 21 |
| 2018 | 51 |
| 2019 | 42 |
| 2020 | 42 |
| 2021 | 69 |
| 2022 | 58 |
| 2023 | 59 |
| 2024 | 40 |
| 2025 | 102 |
| 2026 (YTD) | 128 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing501
- HVAC216
- Bathrooms162
- Kitchens122
- Gas97
- Water heaters90
- Electrical19
- Roofing12
- Generators7
- Additions6
Permit types
As the building departments classify them.
- Plumbing Permit383
- Mechanical Permit190
- 4) Plumbing Permit19
- 3) Mechanical Permit10
- EG Mechanical Permit5
- 1) Building Permit2
- Building Permit2
- EG Plumbing Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 28, 2026 | EG Mechanical Permit | install 140 feet of baseboard heating first floor, connect to existing heat mains and extend loops if necessary. install 70 feet of baseboard heating for 2nd fl | East Greenwich Town | $3,000 |
| Oct 28, 2026 | EG Plumbing Permit | rough and finish to the following fixtures. 3 toilets 3 showers or tub and showers 3 vanities 1 bar sink 1 kitchen sink 1 dishwasher 1 water line for fridge 2 o | East Greenwich Town | $11,000 |
| Oct 26, 2026 | Mechanical Permit | Install roughly 120' of baseboard heat on second and third floor. | West Warwick Town | $2,800 |
| Oct 26, 2026 | Mechanical Permit | — | Exeter Town | — |
| Oct 26, 2026 | Plumbing Permit | — | Exeter Town | — |
| Oct 26, 2026 | Plumbing Permit | make final connections to 2 full bathrooms and kitchen sink. install toilet, shower trim and faucet with drain to both bathrooms. install kitchen faucet and and | West Warwick Town | $3,500 |
| Oct 19, 2026 | Plumbing Permit | connect new water service to existing meter with piping. | Providence City | $400 |
| Oct 19, 2026 | Plumbing Permit | Connect new water service to existing meter with piping | Providence City | $400 |
Permit status
Where its permits stand, as the departments report them.
- Completed463
- Active143
- Stop work ordered6
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.