Contractor · Electrical

Cancasci

61 building permits since 2022 in Los Angeles city, CA.

Building permits
61
Reported job value
—
Active
2022–2023
Latest permit
May 17, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA61

Permits by year

By issue date (application date where there is none).

02040
35
20222023
View as table
YearPermits
202226
202335

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical61
  • Solar43
  • Roofing5
  • New construction3
  • Additions2

Permit types

As the building departments classify them.

  • Electrical61

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 17, 2023ElectricalE-plan. Install a 3.65 kW DC/ 3.0KW AC PV system with 10 modules andLos Angeles City—
May 17, 2023Electrical[EPLAN] PV1 NEW ROOFTOP MOUNTED SYSTEM, SYSTEM SIZE IS 3.9KW DC/ 3KWLos Angeles City—
May 17, 2023Electrical[eplan] Pv1 plan check for new Res PV roof mount solar system rated atLos Angeles City—
May 17, 2023Electrical[ePlanLA] PV roof mount solar, 5.11 kW DC/ 3.8KW AC with 14 modulesLos Angeles City—
May 16, 2023ElectricalE-plan. Addition of PV system, 5.11 kWDc / 3.8 kWA , 14 modules, 3.8 kLos Angeles City—
May 16, 2023ElectricalE-plan. Res PV roof mount solar, 4 kW, 10 modules, new main service paLos Angeles City—
May 16, 2023Electrical[ePlan] New roof-mounted solar PV1 system with (13) modules/optimizersLos Angeles City—
May 16, 2023Electrical[EPLAN] NEW ROOFTOP MOUNTED PV1 INSTALLATION WITH (34) MODULES, (34) OLos Angeles City—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.