Contractor · Electrical

RAFFEL ELECTRIC

62 building permits since 2000 in Buffalo city, NY — $41,400 in reported job value over 25 permits that state one.

Building permits
62
Reported job value
$41.4K
Active
2000–2024
Latest permit
Nov 5, 2024

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Buffalo city, NY62

Permits by year

By issue date (application date where there is none).

048
8
2002200520082012201620192024
View as table
YearPermits
20004
20021
20035
20045
20057
20063
20072
20084
20098
20111
20121
20131
20141
20163
20174
20182
20194
20204
20211
20241

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical62
  • Electric meters21
  • Kitchens7
  • HVAC4
  • Solar4
  • Battery storage4
  • Bathrooms4
  • Pools & hot tubs4
  • Remodels3
  • Generators3

Permit types

As the building departments classify them.

  • ELECTRICAL62

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Nov 5, 2024ELECTRICALIncrease size and relocate the Electrical Service. Relocate meter to exterior of bldg. per National Grid. Install smoke detectors if not in place now. ESO #3105Buffalo City$2,000
Dec 9, 2021ELECTRICALLower unit-Removal of knob and tube wiring. Remodel of bedrooms, bathroom and kitchen lower unit only.Buffalo City$1,000
Aug 26, 2020ELECTRICALSAFETY INSPECTION. Owner had tenant stealing power on 2nd floor. Utility pulled and locked out socket. Building is sold and set to close early next week. I haveBuffalo City$450
Aug 26, 2020ELECTRICALNew Hot tub with CB and GFCI Protection with Emergency Disconnect and grounding as required.Buffalo City$600
Jul 21, 2020ELECTRICALWork Request 29121228 (ESR). A new 200 amp single phase 120/240 volt electrical drop to the building. 2-100 amp Nema 3R enclosures for 2 residential units on thBuffalo City$6,500
Feb 19, 2020ELECTRICALIncrease and relocate the service from 120 v 30 amp (each unit) to a 150 amp Drop at 240 volts split to 2-100 amp 240 volt MCB load centers (Nema 3R) with a subBuffalo City$3,500
Nov 4, 2019ELECTRICALUpdate 2 unit service 150amp riser with 2 100amp MCB loadcenters. Grounding, bonding, smoke system as required. Wire the kitchen and bath in upper unit only!Buffalo City$3,000
Aug 7, 2019ELECTRICALPartial remodel of a multiunit structure on waterfront. Unit was flooded from the second floor.. Remodel of the kitchen/bathroom and closet. Add 5 new circuits Buffalo City$1,000

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.