Contractor · General building

MONUMENT CONSTRUCTION LLC

62 building permits since 2002 in Richmond city, VA — $5,348,443 in reported job value over 34 permits that state one.

Building permits
62
Reported job value
$5.3M
Active
2002–2025
Latest permit
Jun 4, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Richmond city, VA62

Permits by year

By issue date (application date where there is none).

0510
9
2003200620102013201720212025
View as table
YearPermits
20022
20039
20044
20053
20068
20082
20092
20103
20114
20125
20132
20151
20164
20174
20184
20191
20211
20221
20231
20251

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels28
  • Bathrooms10
  • Plumbing10
  • Demolition8
  • Kitchens6
  • Additions6
  • Roofing4
  • Windows & doors4
  • HVAC2
  • New construction2

Permit types

As the building departments classify them.

  • BLDG PRMT (Residential) - Light Alteration or Remodel13
  • Building (C) - Alter/Remodel Light8
  • Water/Sewer (Commercial) - New7
  • Work in Street & Alley PRMT - Barricade (< or = to 60 Days) - Class II4
  • BLDG PRMT (Residential) - Addition3
  • Building (C) - Alter/Remodel Heavy3
  • Building (C) - Demolition3
  • Work in Street & Alley PRMT - Dumpster/Portable Storage - Class II3

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 4, 2025Building (C) - DemolitionInterior demolition of existing finishes & non-load bearing walls under existing dropped ceiling structure. Existing MEP, fire alarm & sprinkler system to be maRichmond City—
Jan 26, 2023Water/Sewer (Commercial) - New6"X 4"DC, 2" DOM AND 1 FH FOR COMMERCIAL BUILDING - BACKFLOW PREVENTION IS REQUIREDRichmond City—
Mar 18, 2022Water/Sewer (Commercial) - New1.5" DOM, 6" DC for Comm Building- Backflow prevention is requiredRichmond City—
Jan 29, 2021Water/Sewer (Commercial) - New1.5" x 1.5" DOM & 6" X 6" DC for fire protectionRichmond City—
Jan 31, 2019Water/Sewer (Commercial) - New2" x 2" DOM & 4" x 4" DC for fire protection - Backflow prevention is requiredRichmond City—
May 10, 2018Water/Sewer (Residential) - Newmap 9 seRichmond City—
May 10, 2018Water/Sewer (Residential) - New9SERichmond City—
Mar 7, 2018Building (C) - Alter/Remodel HeavyClean site of debris, install chain link fence at permitter, remove all existing MEP, masonry repairs, structural repairs as needed. Install new TPO roof, repaiRichmond City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled48
  • Expired14

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.