Contractor · Electrical

michael m post

62 building permits since 2013 in Bridgewater Town city, MA; Taunton city, MA and Foxborough town, MA, across 3 counties — $224,573 in reported job value over 59 permits that state one.

Building permits
62
Reported job value
$224.6K
Active
2013–2026
Latest permit
Oct 8, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Bridgewater Town city, MA60
  • Taunton city, MA1
  • Foxborough town, MA1

Permits by year

By issue date (application date where there is none).

01020
18
2018202020222026*
* 2026 is year to date.
View as table
YearPermits
20131
20181
201910
202018
202112
20226
20253
2026 (YTD)11

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical62
  • Generators8
  • Pools & hot tubs7
  • Electric meters5
  • Bathrooms4
  • Gas3
  • HVAC3
  • Kitchens3
  • Remodels2
  • Additions2

Permit types

As the building departments classify them.

  • ELECT.62

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 8, 2026ELECT.Changing out 6 switches to dimmers, installing 3 wifi switches and adding 60amp sub panel to garage, with trenchBridgewater Town City$2,500
Sep 9, 2026ELECT.Wind blew tree down, took out electric service. Emergency repairBridgewater Town City$750
Sep 3, 2026ELECT.Home being sided, Reattaching lights, outlets and meterBridgewater Town City$1,198
Jul 30, 2026ELECT.Moving 200Amp service from overhead, to undergroundBridgewater Town City$8,000
Apr 21, 2026ELECT.Service replacement, upgrade to 200Amp, Replaced dryer wiring, to a 4 wireBridgewater Town City$6,500
Apr 14, 2026ELECT.Customer changing over from gas water heater to electric, Installed circuit with disconnect for water heater, Replaced 3 fixturesBridgewater Town City$1,200
Apr 10, 2026ELECT.Home being sided, Attaching all outlets, lights and meter socketBridgewater Town City$1,200
Mar 23, 2026ELECT.Upgrading electrical service to 200Amp, underground service, Reusing existing 2" Conduit, Pulling 100amp wires out, pulling 200Amp inBridgewater Town City$7,500

Permit status

Where its permits stand, as the departments report them.

  • Completed55
  • Issued4
  • Expired2
  • Approved1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.