Contractor · Electrical

J C M ELECTRIC

62 building permits since 2016 in Sacramento County, CA; Sacramento city, CA and Davis city, CA, across 5 counties — $579,831 in reported job value over 58 permits that state one.

Building permits
62
Reported job value
$579.8K
Active
2016–2026
Latest permit
Sep 3, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Sacramento County, CA25
  • Sacramento city, CA21
  • Davis city, CA5
  • Citrus Heights city, CA4
  • Elk Grove city, CA3
  • Campbell city, CA1
  • Capitola city, CA1
  • Chico city, CA1
  • San Jose city, CA1

Permits by year

By issue date (application date where there is none).

07.515
11
20172020202220242026*
* 2026 is year to date.
View as table
YearPermits
20166
20172
20184
20205
202110
20223
20232
20247
202511
2026 (YTD)9

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical49
  • EV chargers11
  • HVAC6
  • Plumbing5
  • Solar3
  • Kitchens1
  • Remodels1
  • Roofing1
  • Bathrooms1
  • Electric meters1

Permit types

As the building departments classify them.

  • Single Family13
  • MISR6
  • Electrical5
  • ELECTRIC RESIDENTIAL5
  • PANR5
  • CBNC4
  • MISC4
  • CBAC3

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 3, 2026CBNCINSTALL SIX TESLA ELECTRIC VEHICLE (EV) CHARGERS ON THREE PEDESTALS. · INSTALL THREE 50-AMP BREAKERS. {TWO SHARED ONE BREAKER} · RUN 50 FEET OF PVC (2” TRENCH CSacramento County$51,500
Aug 6, 2026PANRElectrical service panel replacement or emergency repair only. No additional electrical, mechanical, plumbing, or structural work permitted.; Electrical serviceSacramento County$5,000
Jun 25, 2026REVCPlanset needs to be updated to reflect the correct single phaseSacramento County—
Jun 23, 2026CBNCInstall EV chargers -Install (4) new tesla EV chargers on pedestals -Install (3) 60-AMP breakers- two dedicated, one shared) -Run30 ft of PVC (1-1/2" trench conSacramento County$56,000
May 8, 2026EV Charging StationEPC - Install (1) wall mount tesla EV charger. Run 30 ft of 3.4” emt conduit from main panel to charger location. INSIDE EXISTING BUILDING.Sacramento$4,500
Feb 5, 2026CBAC3 EV chargers to be wall mounted on exterior of building. REV02 The plans state 400AMP but its in fact 200AMPSacramento County$15,000
Jan 27, 2026MISCUpgrade installation of lights to LED fixtures in 5 areas Area 1 Front sign: (2) LED fixture flood 45W Mester Lamp AutoGen Area 2 Front Pole: had 1 240W LED fixSacramento County$9,002
Jan 21, 2026ElectricalUpgrade overhead main service panel to 320ampCampbell City—

Permit status

Where its permits stand, as the departments report them.

  • Issued28
  • Completed15
  • Finaled8
  • Closed3
  • Cancelled2
  • Reviews in progress2
  • Active1
  • Expired1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.