Contractor · Electrical
Peter Carlton
63 building permits since 2012 in Marblehead town, MA; Lexington town, MA and Boston city, MA, across 6 counties — $3,277,620 in reported job value over 55 permits that state one.
- Building permits
- 63
- Reported job value
- $3.3M
- Active
- 2012–2026
- Latest permit
- Sep 29, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Marblehead town, MA17
- Lexington town, MA6
- Boston city, MA6
- Gloucester city, MA5
- Salem city, MA5
- Haverhill city, MA3
- Ipswich town, MA3
- North Andover town, MA3
- Everett city, MA3
- North Reading town, MA2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2012 | 1 |
| 2015 | 2 |
| 2017 | 3 |
| 2018 | 4 |
| 2019 | 4 |
| 2020 | 5 |
| 2021 | 7 |
| 2022 | 8 |
| 2023 | 8 |
| 2024 | 8 |
| 2025 | 6 |
| 2026 (YTD) | 7 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical60
- Generators8
- Electric meters5
- HVAC3
- Kitchens2
- Remodels2
- Bathrooms2
- Gas1
- Plumbing1
- Windows & doors1
Permit types
As the building departments classify them.
- Electrical Permit32
- ELECT.8
- Electrical6
- ELECTRICAL4
- *Electrical Permit3
- Electrical Permit - COMMERCIAL ONLY3
- Electrical Permit-TEWKSBURY2
- Building Permit - Residential1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 29, 2026 | Electrical Permit | INSTALL NEW ELECTRIC SERVICE CONDUCTORS, A NEW METER SOCKET AND A NEW MAIN CIRCUIT BREAKER ENCLOSURE FOR THE HARBOR AVE PUMP STATION LOCATED IN FRONT OF 21 HARB | Marblehead Town | $8,000 |
| Jun 30, 2026 | Electrical Permit | INSTALL NEW 30 AMP FEEDER TO THE NEW CRANE HOIST LOCATED BY THE HARBORMASTERS OFFICE AT 1 WATER STREET. 1 WATER STREET WAS NOT AVAILABLE ON THE ON LINE PERMITTI | Beverly City | $12,000 |
| Mar 16, 2026 | Electrical Permit | Replace a section of damaged 60 amp marina power cable and wire two owner supplied shore power pedestals | Salem City | — |
| Feb 17, 2026 | Electrical Permit | Reconfigure the electric service on the compactor building and install a new meter socket. The existing meter socket is located on the utility pole and that is | Marblehead Town | $8,500 |
| Feb 13, 2026 | Electrical Permit | Install a new 200 amp feeder to the new compactor. Wire 1 work booth next to the main comactor and one work booth by the rear compactor. Provide and install 3 a | Marblehead Town | $16,000 |
| Jan 27, 2026 | ELECT. | — | North Reading Town | — |
| Jan 27, 2026 | ELECT. | — | North Reading Town | — |
| Dec 22, 2025 | Electrical Permit | Wire town owned water chemical injection station and underground vault. Install new electric service, generator and station control panel | Groton Town | $150,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed33
- Active24
- Closed3
- Issued3
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.