Contractor · Electrical

Peter Carlton

63 building permits since 2012 in Marblehead town, MA; Lexington town, MA and Boston city, MA, across 6 counties — $3,277,620 in reported job value over 55 permits that state one.

Building permits
63
Reported job value
$3.3M
Active
2012–2026
Latest permit
Sep 29, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Marblehead town, MA17
  • Lexington town, MA6
  • Boston city, MA6
  • Gloucester city, MA5
  • Salem city, MA5
  • Haverhill city, MA3
  • Ipswich town, MA3
  • North Andover town, MA3
  • Everett city, MA3
  • North Reading town, MA2

Permits by year

By issue date (application date where there is none).

048
8
201520182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20121
20152
20173
20184
20194
20205
20217
20228
20238
20248
20256
2026 (YTD)7

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical60
  • Generators8
  • Electric meters5
  • HVAC3
  • Kitchens2
  • Remodels2
  • Bathrooms2
  • Gas1
  • Plumbing1
  • Windows & doors1

Permit types

As the building departments classify them.

  • Electrical Permit32
  • ELECT.8
  • Electrical6
  • ELECTRICAL4
  • *Electrical Permit3
  • Electrical Permit - COMMERCIAL ONLY3
  • Electrical Permit-TEWKSBURY2
  • Building Permit - Residential1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 29, 2026Electrical PermitINSTALL NEW ELECTRIC SERVICE CONDUCTORS, A NEW METER SOCKET AND A NEW MAIN CIRCUIT BREAKER ENCLOSURE FOR THE HARBOR AVE PUMP STATION LOCATED IN FRONT OF 21 HARBMarblehead Town$8,000
Jun 30, 2026Electrical PermitINSTALL NEW 30 AMP FEEDER TO THE NEW CRANE HOIST LOCATED BY THE HARBORMASTERS OFFICE AT 1 WATER STREET. 1 WATER STREET WAS NOT AVAILABLE ON THE ON LINE PERMITTIBeverly City$12,000
Mar 16, 2026Electrical PermitReplace a section of damaged 60 amp marina power cable and wire two owner supplied shore power pedestalsSalem City—
Feb 17, 2026Electrical PermitReconfigure the electric service on the compactor building and install a new meter socket. The existing meter socket is located on the utility pole and that is Marblehead Town$8,500
Feb 13, 2026Electrical PermitInstall a new 200 amp feeder to the new compactor. Wire 1 work booth next to the main comactor and one work booth by the rear compactor. Provide and install 3 aMarblehead Town$16,000
Jan 27, 2026ELECT.—North Reading Town—
Jan 27, 2026ELECT.—North Reading Town—
Dec 22, 2025Electrical PermitWire town owned water chemical injection station and underground vault. Install new electric service, generator and station control panelGroton Town$150,000

Permit status

Where its permits stand, as the departments report them.

  • Completed33
  • Active24
  • Closed3
  • Issued3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.