Contractor · Specialty (solar, fire, telecom)

PELL SOLAR INC

63 building permits since 2013 in Riverside city, CA; Los Angeles city, CA and Norwalk city, CA, across 4 counties — $694,740 in reported job value over 29 permits that state one.

Building permits
63
Reported job value
$694.7K
Active
2013–2025
Latest permit
Feb 13, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Riverside city, CA29
  • Los Angeles city, CA11
  • Norwalk city, CA11
  • Redlands city, CA9
  • San Diego County, CA2
  • Oceanside city, CA1

Permits by year

By issue date (application date where there is none).

01020
16
20142016201820202025
View as table
YearPermits
20138
201411
201516
20164
20174
20187
20195
20205
20212
20251

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar46
  • Electrical37
  • Roofing25
  • Electric meters2
  • Battery storage1
  • Generators1

Permit types

As the building departments classify them.

  • BRES29
  • Electrical11
  • B-BSP Solar9
  • Electrical Residential solar panel3
  • Solar Panel3
  • Solar Panel - Residential & PC3
  • Residential Electrical2
  • BLD SOLAR PV RES1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 13, 2025Residential ElectricalINSTALL 1 ESS BATTERY STORAGE TESLA POWERWALL 3Norwalk City—
Oct 25, 2021Electrical—Los Angeles City—
Oct 25, 2021Electrical—Los Angeles City—
Jul 14, 2020Electrical Residential solar panelMISCELLANEOUS CONDUIT & CONDUCTORS FOR NEW 9.045 KW ROOF MOUNTED PHOTOVOLTAIC SYSTEM. PC#20060233Norwalk City—
Jul 14, 2020Solar PanelNEW 9.045 KW ROOF MOUNTED PHOTOVOLTAIC SYSTEM WITH (27) MODULES-HANWHA Q-CELL Q.PEAK DUO-G6 335 AND (27)INVERTERS- ENPHASE IQ7PLUS-72-2-US PC#20060233Norwalk City—
Jun 16, 2020Solar Panel - Residential & PCPC:NEW 9.045 KW ROOF MOUNTED PHOTOVOLTAIC SYSTEM WITH (27) MODULES-HANWHA Q-CELL Q.PEAK DUO-G6 335 AND (27)INVERTERS- ENPHASE IQ7PLUS-72-2-USNorwalk City—
Mar 9, 2020B-BSP SolarRESIDENTIAL: INSTALL (28) ROOFTOP PHOTOVOLTAIC PANELS (9.380 KW) WITH (28) MICROINVERTERS. DE-RATE THE SUBPANEL FROM 200 AMPS TO 175 AMPS.Redlands City—
Jan 15, 2020B-BSP SolarRESIDENTIAL: INSTALL (31) ROOFTOP PHOTOVOLTAIC (10.385 KW) WITH (31) MICRO-INVERTERS. DERATE THE MAIN ELECTRICAL PANEL FROM 200 AMPS TO 175 AMPS.Redlands City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled39
  • Completed12
  • Not stated11
  • Expired1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.