Contractor · Electrical

PARADISE RENEWABLES

647 building permits since 2015 in Los Angeles city, CA; Burbank city, CA and Riverside city, CA, across 6 counties — $121,996 in reported job value over 8 permits that state one.

Building permits
647
Reported job value
$122K
Active
2015–2026
Latest permit
Jun 9, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA602
  • Burbank city, CA12
  • Riverside city, CA7
  • San Diego County, CA6
  • Camarillo city, CA6
  • Norwalk city, CA3
  • Oceanside city, CA2
  • Vista city, CA2
  • Riverside County, CA1
  • Fontana city, CA1

Permits by year

By issue date (application date where there is none).

0100200
190
201620182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20157
201612
20177
201817
201945
2020190
2021156
2022148
202348
20242
20253
2026 (YTD)10

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical627
  • Solar73
  • Roofing10
  • Battery storage7
  • Electric meters2

Permit types

As the building departments classify them.

  • Electrical612
  • Residential7
  • Electrical Service2
  • Existing2
  • Residential Electrical2
  • RESIDENTIAL ROOFTOP SOLAR SYSTEM2
  • RES ROOFTOP SOLAR SYSTEM 15 KW MAX, ONLINE2
  • Solar2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 9, 2026Electrical PermitSOLAR 8.1 KW & 1 ESS 11.5 - SOLAR APP APPROVAL ID: SA20260609-8363-42-2474-ARosemead City—
Mar 17, 2026ElectricalPermit to swap existing 200 amp main with new 200 amp main. Field verify for code compliance. Have permit and job card on site at time of inspection.Laguna Niguel City—
Mar 11, 2026ResidentialINSTALL PV SOLAR SYSTEM WITH (8) PHOTOVOLTAIC PANELS ON RESIDENTIAL ROOF - 3.24 KW (1) ENERGY STORAGE SYSTEMRiverside City$6,000
Mar 3, 2026ElectricalRooftop mounted solar energy system pv+st 8 q.tron blk m-g2+ 430 solar modules 8 iq8hc-72-m-dom-us {240v} microinverters 1 iqbattery-5p-1p-na {208v} ess system Fontana City—
Feb 4, 2026ElectricalDerate main breaker 200 to 175Los Angeles City—
Jan 22, 2026ElectricalMain panel relocation, 200aLos Angeles City—
Jan 15, 2026Electrical2) tesla powerwall 3,27kwhRiverside County—
Jan 15, 2026ElectricalDerate main breaker 200 to 150Los Angeles City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated597
  • Finaled28
  • Completed10
  • Issued5
  • Active4
  • Additional information required2
  • Pending1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.