Contractor · Plumbing
MARVEL SEWER & DRAIN
66 building permits since 2020 in Columbia Heights city, MN; Minneapolis city, MN and Coon Rapids city, MN, across 2 counties.
- Building permits
- 66
- Reported job value
- —
- Active
- 2020–2026
- Latest permit
- Oct 27, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Columbia Heights city, MN43
- Minneapolis city, MN9
- Coon Rapids city, MN7
- Blaine city, MN5
- Ramsey city, MN2
Permits by year
By issue date (application date where there is none).
01020
18
2020202220242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 1 |
| 2021 | 8 |
| 2022 | 16 |
| 2023 | 10 |
| 2024 | 9 |
| 2025 | 4 |
| 2026 (YTD) | 18 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing58
- Kitchens2
- Bathrooms2
- Gas1
- Grading & excavation1
- Remodels1
- Additions1
- Electrical1
- Water heaters1
Permit types
As the building departments classify them.
- Sewer line connection, repair, or service cut43
- Plumbing9
- BLDG - Residential5
- Sewer & Water5
- Residential2
- Res Plumbing New-Addition-Remodel RI-Final1
- Res Sewer Liner1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 27, 2026 | Plumbing | We will replace the bellied section of 4" underground piping within the foundation of the home. | Minneapolis City | — |
| Oct 14, 2026 | Plumbing | dd a new 2" PVC stack for the kitchen and reroute the existing drain line to the new stack. -Drain repair up to 3" | Minneapolis City | — |
| Oct 2, 2026 | Res Plumbing New-Addition-Remodel RI-Final | Res Plumbing New/Addition/Remodel RI/Final | Coon Rapids | — |
| Sep 30, 2026 | BLDG - Residential | Utilities Sewer Repair | Blaine City | — |
| Sep 8, 2026 | Plumbing | -4" drain replacement - Replace underground 4" cast iron with PVC -3" bathroom tie-in - connect existing bathroom drain to new 4" main -2" kitchen tie-in- conne | Minneapolis City | — |
| Sep 3, 2026 | Plumbing | -Removal of the existing 40 gallon gravity vent water heater and installation of a new 50 gallon electric water heater. The gas supply will be capped. Includes | Minneapolis City | — |
| Sep 2, 2026 | Sewer line connection, repair, or service cut | Install between 50'-59' of Cured In Place Pipe, landing within inches of the city sewer main ensuring coverage of the final joint unless otherwise specified. | Columbia Heights City | — |
| Aug 14, 2026 | Sewer line connection, repair, or service cut | Install between 60'-69' of Cured In Place Pipe, landing within inches of the city sewer main ensuring coverage of the final joint unless otherwise specified. Da | Columbia Heights City | — |
Permit status
Where its permits stand, as the departments report them.
- Completed22
- Expired21
- Finaled14
- Closed7
- Issued2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.