Contractor · Electrical

Joshua Barrette

66 building permits since 2023 in West Warwick town, RI; Warwick city, RI and Cranston city, RI, across 5 counties — $123,790 in reported job value over 54 permits that state one.

Building permits
66
Reported job value
$123.8K
Active
2023–2026
Latest permit
Oct 22, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • West Warwick town, RI11
  • Warwick city, RI8
  • Cranston city, RI6
  • Providence city, RI6
  • Cumberland town, RI4
  • North Kingstown town, RI4
  • North Smithfield town, RI3
  • Narragansett town, RI3
  • Coventry town, RI2
  • East Greenwich town, RI2

Permits by year

By issue date (application date where there is none).

01530
28
2023202420252026*
* 2026 is year to date.
View as table
YearPermits
20234
202415
202528
2026 (YTD)19

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical65
  • Electric meters31
  • Demolition7
  • Bathrooms5
  • Remodels3
  • Solar2
  • Kitchens2
  • Additions2
  • Generators2
  • Gas1

Permit types

As the building departments classify them.

  • Electrical Permit57
  • 2) Electrical Permit6
  • EG Electrical Permit2
  • Plumbing Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 22, 2026Electrical PermitDetach meter socket and reattach for siding sub. Add clips to existing exterior lighting that's pipedProvidence City$500
Oct 13, 2026Electrical PermitInstallation of a new BDA systemWest Warwick Town$53,000
Sep 30, 2026Electrical PermitRemove and reinstall meter socket, 2 recepatcles and 1 light.Warwick City$500
Sep 30, 2026Electrical PermitWiring of pool filter and pool heater. Bonding of pool railing and perimeter of pool back to filter, heater and water bonding.Cumberland Town$1,500
Sep 29, 2026Electrical PermitRenovation of 1st and 2nd floor bathrooms and upgrade to subpanel to a 20 circuit.Barrington Town$2,800
Sep 3, 2026Electrical PermitAdd a 60A, 120/240V, 1 phase 20 position sub panel adjacent to the main 200A panel. Wire a small kitchen, demo some existing wring, add a few receptacles and adJohnston Town$3,000
Sep 1, 2026Electrical PermitUpgrade electrical service from 100A to 200A. Modify electrical circuits, run new circuits and demo out old wiring. Wire all new emergency lighting throughout bCoventry Town$8,000
Aug 19, 2026Electrical PermitInspect for water damaged fixtures and wiring. Replace fan/light in each bathroom with fire rated fans, Add fire rated recessed lights in bathroom. Replace GFCIWoonsocket City$1,190

Permit status

Where its permits stand, as the departments report them.

  • Completed34
  • Active32

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.