Contractor · General building

DRAKE CONSTRUCTION

66 building permits since 2019 in Brunswick County, NC and Oak Island town, NC — $24,042,369 in reported job value over 65 permits that state one.

Building permits
66
Reported job value
$24M
Active
2019–2026
Latest permit
Aug 19, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Brunswick County, NC64
  • Oak Island town, NC2

Permits by year

By issue date (application date where there is none).

01020
16
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20191
202013
202114
20227
20236
202416
20256
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical29
  • New construction28
  • Bathrooms27
  • Roofing24
  • HVAC2
  • Remodels2
  • Windows & doors2
  • Electric meters2
  • Pools & hot tubs2
  • Gas1

Permit types

As the building departments classify them.

  • NEW HOME25
  • T-POLE16
  • TEMPORARY ELECTRICAL POWER6
  • ACCESSORY BUILDING OVER 401 SQ FT3
  • INDIVIDUAL SINGLE FAMILY3
  • TEMPORARY CO3
  • REMODEL/REPAIR2
  • BUILDING1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 19, 2026TEMPORARY ELECTRICAL POWER30 Days - Test bath receptacles and Hvac.Brunswick County$307,440
Jul 9, 2026REMODEL/REPAIRHome Remodel • Describe the Remodel : Delete tub, Enlarge Shower, Move one lavatory, Add lighting • Conditioned Space : 3302 • Unconditioned Space : 750 • Sq FtBrunswick County$21,110
May 1, 2026BUILDINGEnlarge interior cased opening. Engineered letter for details. Move electrical switches as needed.Oak Island$23,000
Nov 7, 2025REMODEL/REPAIRHome Remodel • Describe the Remodel : New Kitchen and Baths, updating all fixtures, appliances, flooring, paint, new exterior doors, change out 1 window. ConditBrunswick County$493,441
Oct 15, 2025ACCESSORY BUILDING OVER 401 SQ FTStorage Building Shed • Requesting Second Electrical Meter : No • Description : Storage of farm equipment • Structural Height : 16 • Intended Use : Storage of fBrunswick County$307,440
Oct 15, 2025INCLUDED T-POLET-Pole Per Plan / HookupBrunswick County$307,440
Sep 18, 2025ELECTRICtemp pwr 30 daysOak Island—
Jul 25, 2025TEMPORARY ELECTRICAL POWER30 Days - test circuits and start grinderBrunswick County$372,592

Permit status

Where its permits stand, as the departments report them.

  • Active65
  • Closed1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.