Contractor · Electrical
Angel Rodriguez
66 building permits since 2020 in Cypress city, CA; Lakewood city, CA and San Bruno city, CA, across 4 counties.
- Building permits
- 66
- Reported job value
- —
- Active
- 2020–2026
- Latest permit
- Oct 15, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Cypress city, CA25
- Lakewood city, CA18
- San Bruno city, CA18
- San Mateo County, CA3
- Oakland city, CA2
Permits by year
By issue date (application date where there is none).
01530
29
2020202220242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 5 |
| 2021 | 1 |
| 2022 | 5 |
| 2023 | 12 |
| 2024 | 5 |
| 2025 | 8 |
| 2026 (YTD) | 29 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical43
- Roofing23
- EV chargers22
- Solar3
- Windows & doors3
Permit types
As the building departments classify them.
- Electrical Permit 202618
- RES_REROOF15
- Electrical Panel Change or Upgrade9
- Electrical Permit8
- Electrical Vehicle Charging Station8
- Roofing7
- RES_ALTERATION1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 15, 2026 | Electrical Permit 2026 | 200 AMP Upgrade main electrical panel AND Install 60A circuit for EV charging and install Tesla Wall Connector. | Lakewood City | — |
| Oct 8, 2026 | Electrical Permit 2026 | Replace existing 200A panel with new 200A panel (like for like). Install 60A circuit for EV charging and hardwire EV charger. | Lakewood City | — |
| Sep 24, 2026 | Electrical Permit 2026 | 200 AMP MAIN PANEL UPGRADE. | Lakewood City | — |
| Sep 15, 2026 | Electrical Panel Change or Upgrade | Upgrade main panel 200 Amps | Cypress City | — |
| Aug 31, 2026 | Electrical Permit 2026 | Upgrade main electrical panel to a 200A service in the same location. | Lakewood City | — |
| Aug 12, 2026 | Electrical Permit 2026 | Upgrade main electrical panel to a 200A service; Install 50A EV circuit and NEMA 14-50 EV outlet. | Lakewood City | — |
| Aug 11, 2026 | Electrical Permit 2026 | Upgrade main electrical panel to a 200A service; install a 50A circuit and NEMA 14-50 EV outlet on exterior wall. | Lakewood City | — |
| Aug 10, 2026 | Electrical Permit 2026 | Upgrade main electrical panel to a 200A service, install a 60A sub panel, install a 50A circuit for EV charging and NEMA 14-50 EV outler in garage. | Lakewood City | — |
Permit status
Where its permits stand, as the departments report them.
- Completed43
- Finaled15
- Issued4
- Active2
- Expired1
- Reviews in progress1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.