Contractor · Electrical

Angel Rodriguez

66 building permits since 2020 in Cypress city, CA; Lakewood city, CA and San Bruno city, CA, across 4 counties.

Building permits
66
Reported job value
—
Active
2020–2026
Latest permit
Oct 15, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Cypress city, CA25
  • Lakewood city, CA18
  • San Bruno city, CA18
  • San Mateo County, CA3
  • Oakland city, CA2

Permits by year

By issue date (application date where there is none).

01530
29
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20205
20211
20225
202312
20245
20258
2026 (YTD)29

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical43
  • Roofing23
  • EV chargers22
  • Solar3
  • Windows & doors3

Permit types

As the building departments classify them.

  • Electrical Permit 202618
  • RES_REROOF15
  • Electrical Panel Change or Upgrade9
  • Electrical Permit8
  • Electrical Vehicle Charging Station8
  • Roofing7
  • RES_ALTERATION1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 15, 2026Electrical Permit 2026200 AMP Upgrade main electrical panel AND Install 60A circuit for EV charging and install Tesla Wall Connector.Lakewood City—
Oct 8, 2026Electrical Permit 2026Replace existing 200A panel with new 200A panel (like for like). Install 60A circuit for EV charging and hardwire EV charger.Lakewood City—
Sep 24, 2026Electrical Permit 2026200 AMP MAIN PANEL UPGRADE.Lakewood City—
Sep 15, 2026Electrical Panel Change or UpgradeUpgrade main panel 200 AmpsCypress City—
Aug 31, 2026Electrical Permit 2026Upgrade main electrical panel to a 200A service in the same location.Lakewood City—
Aug 12, 2026Electrical Permit 2026Upgrade main electrical panel to a 200A service; Install 50A EV circuit and NEMA 14-50 EV outlet.Lakewood City—
Aug 11, 2026Electrical Permit 2026Upgrade main electrical panel to a 200A service; install a 50A circuit and NEMA 14-50 EV outlet on exterior wall.Lakewood City—
Aug 10, 2026Electrical Permit 2026Upgrade main electrical panel to a 200A service, install a 60A sub panel, install a 50A circuit for EV charging and NEMA 14-50 EV outler in garage.Lakewood City—

Permit status

Where its permits stand, as the departments report them.

  • Completed43
  • Finaled15
  • Issued4
  • Active2
  • Expired1
  • Reviews in progress1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.