Contractor · Electrical
TITAN CONSTRUCTION AND SOLAR
67 building permits since 2013 in Los Angeles city, CA; Riverside city, CA and Norwalk city, CA, across 4 counties — $515,600 in reported job value over 13 permits that state one.
- Building permits
- 67
- Reported job value
- $515.6K
- Active
- 2013–2016
- Latest permit
- Dec 7, 2016
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA42
- Riverside city, CA11
- Norwalk city, CA10
- Redlands city, CA3
- Anaheim city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2013 | 4 |
| 2014 | 39 |
| 2015 | 21 |
| 2016 | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical51
- Solar33
- Roofing11
- Additions2
- Plumbing2
- Remodels1
- Windows & doors1
- Electric meters1
Permit types
As the building departments classify them.
- Electrical38
- BRES11
- Solar Panel5
- B-BSP Solar3
- Electrical Residential solar panel3
- Plumbing2
- Residential Electrical2
- Bldg-Addition1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Dec 7, 2016 | — | Residential Remodel:(10) Windows (3) Sliding Door All Retrofit. | Anaheim City | — |
| Jun 15, 2016 | Electrical Residential solar panel | MISC. CONDUITS AND CONDUCTORS FOR THE INSTALLATION OF A ROOF MOUNTED PHOTOVOLTAIC 5.61KW SYSTEM. (17) SUNIVA OPT330-72-4-100 MODULES, (1) SOLAREDGE SE5000A-US ( | Norwalk City | — |
| Jun 15, 2016 | Solar Panel | INSTALLATION OF A ROOF MOUNTED PHOTOVOLTAIC 5.61KW SYSTEM. (17) SUNIVA OPT330-72-4-100 MODULES, (1) SOLAREDGE SE5000A-US (240v), (17) SOLAR EDGE P400 OPOW3R OPT | Norwalk City | — |
| Aug 12, 2015 | B-BSP Solar | ROOF MOUNTED SOLAR SYSTEM 4.48 KW 16 PANELS AND 200 AMP UPGRADE SERVICE | Redlands City | — |
| May 8, 2015 | Electrical | PV1 9.03KW roof-mounted microinverter system with (42) SW-270 Mono so | Los Angeles City | — |
| Apr 15, 2015 | Electrical | PV1. Standard plan. Install roof mounted PV system sized 3.2 kW. Inter | Los Angeles City | — |
| Apr 9, 2015 | Electrical | — | Los Angeles City | — |
| Apr 9, 2015 | Electrical | PV1 SFD. TOTAL SYSTEM SIZE 4.8KW AC USING NONSTANDARD PLAN. INSTALLING | Los Angeles City | — |
Permit status
Where its permits stand, as the departments report them.
- Not stated41
- Finaled16
- Completed10
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.