Contractor · Electrical

ROOSTER ELECTRIC CO

68 building permits since 2024 in Sacramento County, CA; Sacramento city, CA and Citrus Heights city, CA — $270,799 in reported job value over 65 permits that state one.

Building permits
68
Reported job value
$270.8K
Active
2024–2026
Latest permit
Oct 8, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Sacramento County, CA42
  • Sacramento city, CA16
  • Citrus Heights city, CA6
  • Rancho Cordova city, CA2
  • Elk Grove city, CA1
  • Folsom city, CA1

Permits by year

By issue date (application date where there is none).

02040
33
202420252026*
* 2026 is year to date.
View as table
YearPermits
20246
202529
2026 (YTD)33

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical65
  • EV chargers24
  • HVAC13
  • Plumbing13
  • Electric meters2
  • Kitchens1
  • Generators1
  • Pools & hot tubs1

Permit types

As the building departments classify them.

  • MISR28
  • Single Family15
  • PANR13
  • Electrical9
  • EV Charging Station1
  • MISC1
  • ONLINE RESIDENTIAL ELECTRICAL1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 8, 2026MISREV PlugSacramento County$1,600
Oct 8, 2026MISREV plug install - 3/4” emt conduit from panel to garage - #8 awg thhnSacramento County$3,300
Oct 7, 2026PANRElectrical service panel replacement or emergency repair only. No additional electrical, mechanical, plumbing, or structural work permitted.; fyi, House was recSacramento County$4,400
Oct 1, 2026PANRElectrical service panel replacement or emergency repair only. No additional electrical, mechanical, plumbing, or structural work permitted.; meter panel upgradSacramento County$4,800
Sep 1, 2026PANRElectrical service panel replacement or emergency repair only. No additional electrical, mechanical, plumbing, or structural work permitted.; panel replacementSacramento County$5,200
Aug 28, 2026Single FamilyEV Charger Permit: Hardwired EV Charger. Hardwired Charge point EV charger - 32Amp, 40 amp breaker - using crawlspace to connect MSP to the charger - roughly 25Sacramento$2,200
Aug 24, 2026MISR#6 thhn through attic - flex conduit - new sub panel and Tesla EV Charger - interior garage REV01 changing new sub panel feeder breaker from approved 70A to 60ASacramento County$4,400
Aug 10, 2026Single FamilyEPC - 150A MSP change out + Plug in Tesla EV charger - 32Amp, 40 amp GFCI breaker - trenching to detached garage for the charger - roughly 20’. Water conservingSacramento$7,900

Permit status

Where its permits stand, as the departments report them.

  • Finaled37
  • Issued17
  • Completed13
  • Closed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.