Contractor · Electrical

TLP ELECTRIC INTEGRATIONS INC

69 building permits since 2012 in Los Angeles city, CA; Norwalk city, CA and San Diego County, CA, across 4 counties.

Building permits
69
Reported job value
—
Active
2012–2026
Latest permit
Feb 17, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA37
  • Norwalk city, CA12
  • San Diego County, CA11
  • Vista city, CA3
  • Oceanside city, CA2
  • Temecula city, CA2
  • Riverside County, CA1
  • La Habra city, CA1

Permits by year

By issue date (application date where there is none).

07.515
14
20142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20122
20131
20143
20155
20165
20176
20186
20192
20206
202114
202210
20233
20242
20252
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical47
  • Solar38
  • Battery storage7
  • Roofing4
  • Electric meters2
  • HVAC1
  • Remodels1

Permit types

As the building departments classify them.

  • Electrical39
  • Existing6
  • Solar Panel5
  • Residential Electrical4
  • Building Misc - Photovoltaic System (PV)3
  • BLD SOLAR PV RES2
  • BLDG - Building (R)1
  • BLDG - Electrical (R)1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 17, 2026ElectricalInstallation of a 9.68 kw dc photovoltaic system consisting of 22 modules & (1) tesla powerwall 3 battery + (1) tesla expansion unit (13.5 kwh each). Including Riverside County—
Feb 12, 2026ElectricalSolar app+ (sa20260212-4964-15-12440-a): install 7.48kw dc (11.5kw ac) with 17 modules, 1 energy storage system, and 1 inverter. (job val: 31,428)La Habra City—
Feb 12, 2025Residential Electrical(2) ESS BATTERIES, NEW TESLA BACKUP SWITCH. * MAIN SERVICE PANEL: 225A*Norwalk City—
Jan 30, 2025Solar PanelNEW PV SOLAR 7.14KW W/ (17) MODULES.Norwalk City—
Feb 20, 2024BLDG - Building (R)Online. Roof mount solar 44 panels 5 batteries, 200 A subpanel and MPU to 200 A. Knudsen residenceTemecula City—
Feb 20, 2024BLDG - Electrical (R)Online. MPU for solar B24-0343. Knudsen residenceTemecula City—
May 11, 2023Building Misc - Photovoltaic System (PV)ROOF MOUNT SOLAR PHOTOVOLTAIC SYSTEMVista City—
Mar 21, 2023Residential ElectricalNEW MAIN PANEL UPGRADE 225A/200A. (PC:BS2301224)Norwalk City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated37
  • Completed16
  • Finaled10
  • Active3
  • Issued3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.