Contractor · Electrical

Joshua Martinez

69 building permits since 2019 in Bristol town, CT; Glastonbury town, CT and South Windsor town, CT, across 5 counties — $257,634 in reported job value over 66 permits that state one.

Building permits
69
Reported job value
$257.6K
Active
2019–2026
Latest permit
Oct 27, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Bristol town, CT28
  • Glastonbury town, CT17
  • South Windsor town, CT7
  • Enfield town, CT4
  • Rocky Hill town, CT2
  • Winchester town, CT2
  • Darien town, CT2
  • New Milford town, CT2
  • Wethersfield town, CT1
  • Griswold town, CT1

Permits by year

By issue date (application date where there is none).

01020
17
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20194
20206
20212
20224
202311
202413
202517
2026 (YTD)12

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical68
  • EV chargers36
  • Windows & doors5
  • Electric meters5
  • HVAC3
  • Solar3
  • Bathrooms3
  • Generators3
  • Gas2
  • Battery storage2

Permit types

As the building departments classify them.

  • Electrical Permit49
  • Electrical Permit General17
  • Building Permit (No Trades)2
  • Building Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 27, 2026Electrical PermitInstall an EcoFlow SHP 3 battery backup system and integrate it into the home’s electrical system. - Placement and setup of the EcoFlow battery unit - InstallatNew Milford Town$2,200
Oct 20, 2026Electrical PermitProperty owner installed (2) porch lights. We are inspecting the installation to confirm code compliance and pulling the permit for property owner.Bristol Town$650
Oct 20, 2026Electrical PermitEV CHARGER - Installer to remove the existing EV charger and install a new Autel (40A) single-port EV charger mounted on a new single-port pedestal, anchored inRocky Hill Town—
Oct 20, 2026Electrical Permit GeneralRemove the existing EV chargers and install two new Autel (40A) single-port EV chargers mounted on a new dual-port pedestal, anchored into the existing concreteGlastonbury Town$2,108
Aug 12, 2026Electrical Permitinstall electricity for above ground pool filter and Convenience receptacle. Install bonding grid around pool and bond equipment. Provide a trench from the housBristol Town$1,500
Jul 20, 2026Electrical PermitHardwired installation of customer purchased Emporia Pro Level 2 EV charger with load management built-in. Charger installed on a 50Amp circuit with charger outSouth Windsor Town$2,408
Jul 13, 2026Electrical PermitEquipment: EV CHARGER Emporia Pro Charger Emporia Vue Energy Monitor Quad Breaker Proposed installation plan: Install a new 50A circuit in the 100A MSP and routRocky Hill Town—
Jul 2, 2026Electrical Permit GeneralAmpUp Artemis Residential Charger Proposed installation plan Install a new 50A circuit in the 200A main panel and route wiring through the unfinished basement cGlastonbury Town$1,809

Permit status

Where its permits stand, as the departments report them.

  • Completed43
  • Active26

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.