Contractor · Plumbing

Joseph Whitney

69 building permits since 2010 in Lexington town, MA; Peabody city, MA and Milton town, MA, across 5 counties — $7,616,000 in reported job value over 15 permits that state one.

Building permits
69
Reported job value
$7.6M
Active
2010–2025
Latest permit
Mar 24, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Lexington town, MA42
  • Peabody city, MA12
  • Milton town, MA4
  • Walpole town, MA3
  • Andover town, MA2
  • Manchester-by-the-Sea town, MA2
  • Boston city, MA2
  • North Andover town, MA1
  • Sutton town, MA1

Permits by year

By issue date (application date where there is none).

07.515
15
201020142016201820202025
View as table
YearPermits
20101
20122
20148
20159
201610
201712
201815
20199
20201
20211
20251

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing58
  • Gas17
  • Remodels16
  • Bathrooms12
  • HVAC11
  • Demolition11
  • Kitchens8
  • Water heaters7
  • Roofing2
  • Generators2

Permit types

As the building departments classify them.

  • Plumbing32
  • Plumbing Permit11
  • Gas10
  • Gas Permit Application4
  • PLUMB.4
  • Gas Permit Residential One and Two Family2
  • PLUMBING2
  • *Building Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 24, 2025*Building PermitRepairing damaged SheetrockNorth Andover Town$5,000
May 27, 2021Building Permit - One and Two FamilyImstall Reeds Ferry 8x12 ShedSutton Town$5,000
Jan 27, 2020Plumbing PermitDemo exiting lab space. Rework lab waste, sanitary waste, water piping for new lab spaceAndover Town$518,000
Jun 28, 2019Plumbingplumb lab roomLexington Town—
Jun 24, 2019PlumbingRenovation of existing lab. Small demo scope. Add ES/EW units to existing TW system.Lexington Town—
Jun 17, 2019PlumbingRenovate existing lab building. renovate first floor lab- new eyewash units, lab sinks. new bathrooms, breakroom sinks, on second and third floor office areasLexington Town—
Jun 12, 2019GasNew gas service. Gas pipe kitchen equipment. gas pipe boilers in the penthouseLexington Town—
Jun 11, 2019PlumbingNew lab building from ground up. Piping future lab waste risers and piping to future pH tanks. New commercial kitchen level one. New shower room level 1. Core bLexington Town—

Permit status

Where its permits stand, as the departments report them.

  • Completed62
  • Issued3
  • Closed2
  • Active1
  • Finaled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.