Contractor · Electrical
Hunter Collins
69 building permits since 2024 in Mesa city, AZ — $718,449 in reported job value over 68 permits that state one.
- Building permits
- 69
- Reported job value
- $718.4K
- Active
- 2024–2026
- Latest permit
- Aug 27, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ69
Permits by year
By issue date (application date where there is none).
03060
51
202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 8 |
| 2025 | 51 |
| 2026 (YTD) | 9 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Battery storage69
- Electrical69
- Solar67
- Electric meters61
Permit types
As the building departments classify them.
- Electrical69
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 27, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE | Mesa | $9,749 |
| May 19, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE | Mesa | $9,000 |
| May 4, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE | Mesa | $10,353 |
| Apr 24, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE | Mesa | $10,805 |
| Apr 16, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE | Mesa | $23,743 |
| Mar 2, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTIL | Mesa | $20,100 |
| Feb 23, 2026 | Electrical | PERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORM | Mesa | $18,000 |
| Jan 14, 2026 | Electrical | PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTIL | Mesa | $9,000 |
Permit status
Where its permits stand, as the departments report them.
- C/o issued68
- Additional information required1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.