Contractor · Roofing

ECONO-ROOFING

69 building permits since 2017 in Merced city, CA; Sacramento city, CA and Tuolumne County, CA, across 6 counties — $1,200,660 in reported job value over 67 permits that state one.

Building permits
69
Reported job value
$1.2M
Active
2017–2026
Latest permit
Oct 13, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Merced city, CA44
  • Sacramento city, CA13
  • Tuolumne County, CA4
  • Sacramento County, CA3
  • Citrus Heights city, CA2
  • Danville town, CA1
  • Hayward city, CA1
  • Lodi city, CA1

Permits by year

By issue date (application date where there is none).

07.515
13
20182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20175
20187
201913
20206
20212
20229
20234
20243
20257
2026 (YTD)13

Type of work

Permits describing each kind of work; one permit can cover several.

  • Roofing59
  • Windows & doors6
  • HVAC3
  • Plumbing3
  • Electrical2
  • Solar1
  • Remodels1

Permit types

As the building departments classify them.

  • RE11 RESIDENTAIL REROOF22
  • Apts 5+9
  • Re-Roof/Roof Overlay9
  • 00 RE11 RESIDENTAIL REROOF8
  • Apts 3-43
  • Residential Reroof3
  • RE2
  • Reroof2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 13, 2026Re-Roof/Roof Overlaytear off 1 layer comp re roof with cool comp. ***ROOF NAIL AND FINAL REQUIRED*** ALL INSPECTIONS MUST BE SCHEDULED THROUGH YOUR CIVIC ACCESSS PORTAL. CONTRACTORMerced City$15,000
Sep 23, 2026Residential Reroof—Tuolumne County$2,000
Sep 23, 2026Residential Reroof—Tuolumne County$20,000
Aug 11, 2026Re-Roof/Roof OverlayTear off & reroof W/ cool roof ALL INSPECTIONS MUST BE SCHEDULED THROUGH YOUR CIVIC ACCESS PORTAL. ALL INDIVIDUALS RESPONSIBLE FOR SCHEDULING INSPECTIONS MUST HMerced City$10,000
Jul 15, 2026Re-Roof/Roof OverlayTear off 2 layer comp repair dry rot reroof W cool roof comp ***ROOF NAIL AND FINAL REQUIRED*** CONTRACTOR SHALL PROVIDE A SECURE LADDER WITH A MINIMUM OF 3 RUNMerced City$15,000
Jun 1, 2026Re-Roof/Roof OverlayTear off & reroof. ***ROOF NAIL AND FINAL REQUIRED*** ALL INSPECTIONS MUST BE SCHEDULED THROUGH YOUR CIVIC ACCESSS PORTAL. CONTRACTOR OR PROPERTY OWNER MUST BE Merced City$15,000
Apr 28, 2026Re-Roof/Roof Overlaytear off 1 layer shake, install 7/16 osb, reroof w/ cool roof compMerced City$20,000
Apr 13, 2026Re-Roof/Roof Overlaytear off existing roof, repair dry rot & re roof w/ 50mil pvc single ply membrane. ***ROOF NAIL AND FINAL REQUIRED*** ALL INSPECTIONS MUST BE SCHEDULED THROUGH Merced City$30,000

Permit status

Where its permits stand, as the departments report them.

  • Issued57
  • Finaled5
  • Not stated4
  • Completed2
  • Active1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.